10-Q 1 v441606_10q.htm FORM 10-Q

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 10-Q

 

xQUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended April 30, 2016

 

or

 

¨TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from _____ to _____

 

Commission File Number: 001-33706

 

  URANIUM ENERGY CORP.  
  (Exact name of registrant as specified in its charter)  

 

Nevada   98-0399476
(State or other jurisdiction of incorporation of organization)   (I.R.S. Employer Identification No.)

 

  1030 West Georgia Street, Suite 1830, Vancouver, B.C.   V6E 2Y3  
  (Address of principal executive offices)   (Zip Code)  

 

 

(604) 682-9775

 
  (Registrant’s telephone number, including area code)  

 

 

N/A

 
 

(Former name, former address and former fiscal year, if changed since last report)

 

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes  x   No  ¨

 

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes  x   No  ¨

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See the definitions of “large accelerated filer”, “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

¨  Large accelerated filer   x  Accelerated filer
     
¨  Non-accelerated filer (Do not check if a smaller reporting company)   ¨  Smaller reporting company

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes  ¨   No  x

 

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date: 116,414,054 shares of common stock outstanding as of June 6, 2016.

 

 

 

 

URANIUM ENERGY CORP.

 

TABLE OF CONTENTS

 

PART I – FINANCIAL INFORMATION 3
     
Item 1. Financial Statements 3
     
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations 27
     
Item 3. Quantitative and Qualitative Disclosures About Market Risk 36
     
Item 4. Controls and Procedures 36
     
PART II – OTHER INFORMATION 37
     
Item 1. Legal Proceedings 37
     
Item 1A. Risk Factors 38
     
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 48
     
Item 3. Defaults Upon Senior Securities 49
     
Item 4. Mine Safety Disclosures 49
     
Item 5. Other Information 49
     
Item 6. Exhibits 49
     
SIGNATURES 50

 

 2 

 

 

PART I – FINANCIAL INFORMATION

 

Item 1.          Financial Statements

 

 3 

 

 

URANIUM ENERGY CORP.

 

CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

FOR THE NINE MONTHS ENDED APRIL 30, 2016

 

(Unaudited)

 

 4 

 

 

URANIUM ENERGY CORP.

CONDENSED CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

 

 

       April 30, 2016   July 31, 2015 
             
CURRENT ASSETS               
Cash and cash equivalents       $10,086,805   $10,092,408 
Inventories        251,999    251,999 
Prepaid expenses and deposits        751,598    444,500 
Other current assets        24,730    18,711 
         11,115,132    10,807,618 
                
MINERAL RIGHTS AND PROPERTIES   3    38,163,086    38,437,967 
PROPERTY, PLANT AND EQUIPMENT   4    7,020,860    6,948,647 
RECLAMATION DEPOSITS   5    1,706,026    1,706,025 
OTHER LONG-TERM ASSET   6    1,553,388    - 
        $59,558,492   $57,900,257 
                
CURRENT LIABILITIES               
Accounts payable and accrued liabilities       $2,113,018   $2,538,544 
Due to related parties   7    897    14,660 
Current portion of long-term debt        -    1,666,667 
Current portion of asset retirement obligations        -    340,827 
         2,113,915    4,560,698 
                
DEFERRED INCOME TAX LIABILITIES        653,154    676,064 
LONG-TERM DEBT   8    18,913,370    18,090,811 
OTHER LONG-TERM LIABILITY   6    315,519    - 
ASSET RETIREMENT OBLIGATIONS   9    3,932,073    3,586,019 
         25,928,031    26,913,592 
                
STOCKHOLDERS' EQUITY               
Capital stock                

Common stock $0.001 par value: 750,000,000 shares

authorized, 116,092,655 shares issued and outstanding

(July 31, 2015 - 97,834,087)

   10    116,093    97,841 
Additional paid-in capital        239,105,949    222,927,529 
Accumulated deficit        (205,576,668)   (192,024,074)
Accumulated other comprehensive loss        (14,913)   (14,631)
         33,630,461    30,986,665 
        $59,558,492   $57,900,257 
                
COMMITMENTS AND CONTINGENCIES   14           

 

The accompanying notes are an integral part of these condensed consolidated financial statements

 

 5 

 

 

URANIUM ENERGY CORP.

CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE LOSS

(Unaudited)

 

 

 

      Three Months Ended April 30,   Nine Months Ended April 30, 
   Notes  2016   2015   2016   2015 
SALES     $-   $-   $-   $- 
                        
COSTS AND EXPENSES                       
Cost of sales      -    -    -    - 
Mineral property expenditures  3, 9   725,968    1,045,842    3,408,813    4,560,241 
General and administrative  7,10   2,005,465    3,167,896    7,086,669    9,711,933 
Depreciation, amortization and accretion  3, 4, 9   205,488    374,082    680,573    1,440,808 
Impairment loss on mineral properties  3   -    -    86,535    - 
       2,936,921    4,587,820    11,262,590    15,712,982 
LOSS FROM OPERATIONS      (2,936,921)   (4,587,820)   (11,262,590)   (15,712,982)
                        
OTHER INCOME (EXPENSES)                       
Interest income      7,221    1,640    14,470    9,646 
Interest expenses and finance costs  8   (710,767)   (764,761)   (2,278,230)   (2,270,104)
Loss on disposition of assets      -    2,400    (2,186)   (498)
Realized loss on available-for-sale securities      -    (3,023)   -    (3,023)
Loss on settlement of current liabilities  7,13   (46,968)   -    (46,968)   - 
       (750,514)   (763,744)   (2,312,914)   (2,263,979)
LOSS BEFORE INCOME TAXES      (3,687,435)   (5,351,564)   (13,575,504)   (17,976,961)
                        
DEFERRED INCOME TAX BENEFIT      8,380    3,835    22,910    27,465 
NET LOSS FOR THE PERIOD      (3,679,055)   (5,347,729)   (13,552,594)   (17,949,496)
                        
OTHER COMPREHENSIVE LOSS (INCOME),                       
NET OF INCOME TAXES      136    207    (282)   (1,465)
TOTAL COMPREHENSIVE LOSS FOR THE PERIOD     $(3,678,919)  $(5,347,522)  $(13,552,876)  $(17,950,961)
                        
NET LOSS PER SHARE, BASIC AND DILUTED  11  $(0.03)  $(0.06)  $(0.13)  $(0.20)
                        
WEIGHTED AVERAGE NUMBER OF SHARES OUTSTANDING, BASIC AND DILUTED      109,710,985    92,034,908    102,588,834    91,683,568 

 

The accompanying notes are an integral part of these condensed consolidated financial statements

 

 6 

 

 

URANIUM ENERGY CORP.

CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

 

 

       Nine Month Ended April 30, 
   Notes   2016   2015 
CASH PROVIDED BY (USED IN):               
                
OPERATING ACTIVITIES               
Net loss for the period       $(13,552,594)  $(17,949,496)
Adjustments to reconcile net loss to cash flows in operating activities               
Stock-based compensation   10    2,487,651    4,628,544 
Depreciation, amortization and accretion   3,4,9    680,573    1,440,808 
Amortization of long-term debt discount   8    960,807    994,668 
Re-valuation of asset retirement obligations   3,9    (184,381)   - 
Impairment loss on mineral properties   3    86,535    - 
Loss on disposition of assets        2,186    498 
Realized loss on available-for-sale securities        -    3,023 
Loss on settlement of current liabilities   7,13    46,968    - 
Deferred income tax benefit        (22,910)   (27,465)
Changes in operating assets and liabilities               
Inventories        -    (244,045)
Prepaid expenses and deposits        (303,294)   (94,035)
Other current assets        (6,301)   (478)
Accounts payable and accrued liabilities        (460,536)   (513,926)
NET CASH FLOWS USED IN OPERATING ACTIVITIES        (10,265,296)   (11,761,904)
                
FINANCING ACTIVITIES               
Shares issuance for cash, net of issuance costs   10    10,324,264    435,590 
Due to related parties        -    19,394 
NET CASH FLOWS PROVIDED BY FINANCING ACTIVITIES        10,324,264    454,984 
                
INVESTING ACTIVITIES               
Net cash used in asset acquisition   6    (46,084)   - 
Investment in mineral rights and properties        -    (73,624)
Purchase of property, plant and equipment        (19,304)   (10,905)
Proceeds from disposition of assets        818    2,400 
Cash proceeds from the release of reclamation deposits        -    5,663,158 
Payment of collateral for surety bonds        -    (1,690,208)
Decrease in reclamation deposits        (1)   (346)
NET CASH FLOWS (USED IN) PROVIDED BY INVESTING ACTIVITIES        (64,571)   3,890,475 
                
NET CASH FLOWS        (5,603)   (7,416,445)
CASH AND CASH EQUIVALENTS, BEGINNING OF PERIOD        10,092,408    8,839,892 
CASH AND CASH EQUIVALENTS, END OF PERIOD       $10,086,805   $1,423,447 
                
SUPPLEMENTAL CASH FLOW INFORMATION   8,13           

 

The accompanying notes are an integral part of these condensed consolidated financial statements

 

 7 

 

 

URANIUM ENERGY CORP.

CONDENSED CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY

(Unaudited)

 

 

 

               Accumulated     
               Other     
   Common Stock   Additional Paid-   Accumulated   Comprehensive   Stockholders' 
   Shares   Amount   in Capital   Deficit   Loss   Equity 
Balance, July 31, 2015   97,834,087   $97,841   $222,927,529   $(192,024,074)  $(14,631)  $30,986,665 
Common stock                              
Issued for equity financing, net of issuance costs   12,364,704    12,365    9,972,152    -    -    9,984,517 
Issued for exercise of stock options   682,167    682    224,433    -    -    225,115 
Issued for credit facility   1,711,933    1,712    1,698,288    -    -    1,700,000 
Issued for asset acquisition   1,333,560    1,334    1,225,541    -    -    1,226,875 
Issued for settlement of current liabilities   487,574    487    452,957    -    -    453,444 
Stock-based compensation                              
Common stock issued for consulting services   1,370,843    1,370    1,336,721    -    -    1,338,091 
Common stock issued for compensation   307,787    302    279,028    -    -    279,330 
Stock options issued to consultants   -    -    66,317    -    -    66,317 
Stock options issued to management   -    -    640,789    -    -    640,789 
Stock options issued to employees   -    -    163,124    -    -    163,124 
Warrants extension for mineral property   -    -    14,155    -    -    14,155 
Warrants extension for credit facility   -    -    104,915    -    -    104,915 
Net loss for the period   -    -    -    (13,552,594)   -    (13,552,594)
Other comprehensive loss   -    -    -    -    (282)   (282)
Balance, April 30, 2016   116,092,655   $116,093   $239,105,949   $(205,576,668)  $(14,913)  $33,630,461 

 

The accompanying notes are an integral part of these condensed consolidated financial statements

 

 8 

 

 

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

NOTE 1:NATURE OF OPERATIONS AND GOING CONCERN

 

Uranium Energy Corp. was incorporated in the State of Nevada on May 16, 2003. Uranium Energy Corp. and its subsidiary companies and a controlled partnership (collectively, the “Company”) are engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing of uranium concentrates, on projects located in the United States and Paraguay.

 

Although planned principal operations have commenced from which significant revenues from sales of uranium concentrates were realized for the fiscal years ended July 31, 2015 (“Fiscal 2015”), 2013 (“Fiscal 2013”) and 2012 (“Fiscal 2012”), the Company has yet to achieve profitability and has had a history of operating losses resulting in an accumulated deficit balance since inception. No revenue from uranium sales was realized for the nine months ended April 30, 2016 and the fiscal year ended July 31, 2014 (“Fiscal 2014”). Historically, the Company has been reliant primarily on equity financings from the sale of its common stock and, during Fiscal 2014 and Fiscal 2013, on debt financing in order to fund its operations, and this reliance is expected to continue for the foreseeable future.

 

At April 30, 2016, the Company had a working capital of $9.0 million including cash and cash equivalents of $10.1 million. As the Company does not expect to achieve and maintain profitability in the near term, the continuation of the Company as a going concern is dependent upon its ability to obtain adequate additional financing which the Company has successfully secured since its inception, including those from asset divestitures. However, there is no assurance that the Company will be successful in securing any form of additional financing in the future when required and on terms favorable to the Company; therefore substantial doubt exist as to whether the Company’s cash resources and working capital will be sufficient to enable the Company to continue as a going concern for the next twelve months. The continued operations of the Company, including the recoverability of the carrying values of its assets, are dependent ultimately on the Company’s ability to achieve and maintain profitability and positive cash flow from its operations.

 

These consolidated financial statements have been prepared on a going concern basis and do not include any adjustments to the amounts and classification of assets and liabilities that may be necessary in the event the Company can no longer continue as a going concern.

 

NOTE 2:BASIS OF PRESENTATION

 

The accompanying unaudited interim condensed consolidated financial statements are presented in U.S. dollars and have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”) for interim financial information. Accordingly, they do not include all of the information and footnotes required under U.S. GAAP for complete financial statements. These unaudited interim condensed consolidated financial statements should be read in conjunction with the audited consolidated financial statements included in the Company’s Annual Report on Form 10-K for the fiscal year ended July 31, 2015. In the opinion of management, all adjustments of a normal recurring nature and considered necessary for a fair presentation have been made. Operating results for the nine months ended April 30, 2016 are not necessarily indicative of the results that may be expected for the fiscal year ending July 31, 2016.

 

Certain comparative figures have been reclassified to conform to the current year’s presentation.

 

Exploration Stage

 

The Company has established the existence of mineralized materials for certain uranium projects, including the Palangana Mine. The Company has not established proven or probable reserves, as defined by the United States Securities and Exchange Commission (the “SEC”) under Industry Guide 7, through the completion of a “final” or “bankable” feasibility study for any of its uranium projects, including the Palangana Mine. Furthermore, the Company has no plans to establish proven or probable reserves for any of its uranium projects for which the Company plans on utilizing in-situ recovery (“ISR”) mining, such as the Palangana Mine. As a result, and despite the fact that the Company commenced extraction of mineralized materials at the Palangana Mine in November 2010, the Company remains in the Exploration Stage as defined under Industry Guide 7, and will continue to remain in the Exploration Stage until such time proven or probable reserves have been established.

 

 9 

 

 

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

Since the Company commenced extraction of mineralized materials at the Palangana Mine without having established proven or probable reserves, any mineralized materials established or extracted from the Palangana Mine should not in any way be associated with having established or produced from proven or probable reserves.

 

In accordance with U.S. GAAP, expenditures relating to the acquisition of mineral rights are initially capitalized as incurred while exploration and pre-extraction expenditures are expensed as incurred until such time the Company exits the Exploration Stage by establishing proven or probable reserves.  Expenditures relating to exploration activities such as drill programs to establish mineralized materials are expensed as incurred. Expenditures relating to pre-extraction activities such as the construction of mine wellfields, ion exchange facilities and disposal wells are expensed as incurred until such time proven or probable reserves are established for that project, after which expenditures relating to mine development activities for that particular project are capitalized as incurred.

 

Companies in the Production Stage as defined under Industry Guide 7, having established proven and probable reserves and exited the Exploration Stage, typically capitalize expenditures relating to ongoing development activities, with corresponding depletion calculated over proven and probable reserves using the units-of-production method and allocated to future reporting periods to inventory and, as that inventory is sold, to cost of goods sold. The Company is in the Exploration Stage which has resulted in the Company reporting larger losses than if it had been in the Production Stage due to the expensing, rather than capitalization, of expenditures relating to ongoing mill and mine development activities. Additionally, there would be no corresponding amortization allocated to future reporting periods of the Company since those costs would have been expensed previously, resulting in both lower inventory costs and cost of goods sold and results of operations with higher gross profits and lower losses than if the Company had been in the Production Stage. Any capitalized costs, such as expenditures relating to the acquisition of mineral rights, are depleted over the estimated extraction life using the straight-line method. As a result, the Company’s consolidated financial statements may not be directly comparable to the financial statements of companies in the Production Stage.

 

Recently Issued Accounting Pronouncement

 

In March 2016, the Financial Accounting Standards Board issued Accounting Standards Update No. 2016-09, Improvement to Employee Share-Based Payment Accounting (“ASU 2016-09”) as part of its simplification initiative. ASU 2016-09 allows an entity to make an entity-wide accounting policy election to either estimate the number of awards that are expected to vest (current U.S. GAAP) or account for forfeitures when they occur. For public business entities, ASU 2016-09 is effective for annual periods ending after December 15, 2016, and interim periods thereafter, with early adoption permitted. The Company plans to make an election to account for forfeitures when they occur for the fiscal year ending July 31, 2017, and doesn’t expect that this election would have a significant impact on the Company’s consolidated financial statements.

 

 10 

 

 

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

NOTE 3:MINERAL RIGHTS AND PROPERTIES

 

Mineral Rights

 

At April 30, 2016, the Company had mineral rights in the States of Arizona, Colorado, New Mexico, Texas and Wyoming and in the Republic of Paraguay. These mineral rights were acquired through staking, purchase or lease agreements and are subject to varying royalty interests, some of which are indexed to the sale price of uranium. At April 30, 2016, annual maintenance payments of approximately $2,500,000 were required to maintain these mineral rights.

 

Mineral rights and property acquisition costs consisted of the following:

 

   April 30, 2016   July 31, 2015 
Mineral Rights and Properties          
Palangana Mine  $6,562,348   $6,587,135 
Goliad Project   8,689,127    8,689,127 
Burke Hollow Project   1,495,750    1,495,750 
Longhorn Project   116,870    116,870 
Salvo Project   14,905    14,905 
Nichols Project   154,774    154,774 
Anderson Project   9,154,268    9,154,268 
Workman Creek Project   1,472,008    1,472,008 
Los Cuatros Project   257,250    257,250 
Slick Rock Project   615,650    661,271 
Yuty Project   11,947,144    11,947,144 
Coronel Oviedo Project   1,133,412    1,133,412 
Other Property Acquisitions   244,827    285,741 
    41,858,333    41,969,655 
Accumulated Depletion   (3,929,884)   (3,929,884)
    37,928,449    38,039,771 
           
Databases   2,410,038    2,410,038 
Accumulated Amortization   (2,314,890)   (2,166,966)
    95,148    243,072 
           
Land Use Agreements   404,310    390,155 
Accumulated Amortization   (264,821)   (235,031)
    139,489    155,124 
   $38,163,086   $38,437,967 

 

The Company has not established proven or probable reserves, as defined by the SEC under Industry Guide 7, for any of its mineral projects. The Company has established the existence of mineralized materials for certain uranium projects, including the Palangana Mine. Since the Company commenced uranium extraction at the Palangana Mine without having established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be economically extracted as originally planned and anticipated.

 

During the nine months ended April 30, 2016, the asset retirement obligations (“ARO”) of the Palangana Mine were revised due to changes in the estimated timing of restoration and reclamation of the Palangana Mine, resulting in the corresponding mineral rights and properties being reduced by $24,787, and a credit amount of re-valuation of ARO totaling $184,381 being recorded against the mineral property expenditures for the Palangana Mine. Refer to Note 9. Asset Retirement Obligations.

 

 11 

 

 

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

During the nine months ended April 30, 2016, the Company abandoned certain mineral interests at projects located in Colorado and New Mexico having a combined acquisition cost of $86,535. As a result, an impairment loss on mineral properties of $86,535 was reported on the consolidated statement of operations for the nine months ended April 30, 2016.

 

During the three and nine months ended April 30, 2016, the Company continued with the strategic plan for reduced operations implemented in Fiscal 2014 and further reduced operations at the Palangana Mine to capture residual uranium only. As a result, no depletion for the Palangana Mine was recorded on the Company’s consolidated financial statements for the three and nine months ended April 30, 2016.

 

Mineral property expenditures incurred by major projects were as follows:

 

   Three Months Ended April 30,   Nine Months Ended April 30, 
   2016   2015   2016   2015 
Mineral Property Expenditures                    
Palangana Mine  $280,345   $500,535   $1,031,625   $1,621,391 
Goliad Project   26,848    25,631    71,679    79,924 
Burke Hollow Project   48,409    94,702    974,661    1,235,250 
Longhorn Project   247    22,276    4,620    52,999 
Salvo Project   4,622    16,751    21,697    39,590 
Anderson Project   3,564    50,142    170,780    173,564 
Workman Creek Project   418    -    32,109    31,300 
Slick Rock Project   -    2,924    53,861    52,708 
Yuty Project   89,246    41,274    291,788    301,035 
Coronel Oviedo Project   136,031    132,315    422,763    428,077 
Other Mineral Property Expenditures   136,238    159,292    517,611    544,403 
Re-valuation of Asset Retirement Obligations   -    -    (184,381)   - 
   $725,968   $1,045,842   $3,408,813   $4,560,241 

 

NOTE 4:PROPERTY, PLANT AND EQUIPMENT

 

Property, plant and equipment consisted of the following:

 

   April 30, 2016   July 31, 2015 
       Accumulated   Net Book       Accumulated   Net Book 
   Cost   Depreciation   Value   Cost   Depreciation   Value 
Hobson Processing Facility  $6,819,088   $(773,933)  $6,045,155   $6,819,088   $(773,933)  $6,045,155 
Mining Equipment   2,440,105    (2,202,485)   237,620    2,452,572    (2,019,996)   432,576 
Logging Equipment and Vehicles   1,962,895    (1,785,206)   177,689    1,962,895    (1,714,908)   247,987 
Computer Equipment   585,434    (549,175)   36,259    615,064    (573,355)   41,709 
Furniture and Fixtures   172,215    (167,598)   4,617    182,802    (176,726)   6,076 
Land   519,520    -    519,520    175,144    -    175,144 
   $12,499,257   $(5,478,397)  $7,020,860   $12,207,565   $(5,258,918)  $6,948,647 

 

During the three and nine months ended April 30, 2016, no uranium concentrate was processed at the Hobson Processing Facility due to the further reduced operations at the Palangana Mine. As a result, no depreciation for the Hobson Processing Facility was recorded on the consolidated financial statements for the three and nine months ended April 30, 2016.

 

 12 

 

 

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

NOTE 5: RECLAMATION DEPOSITS

 

Reclamation deposits include interest and non-interest bearing deposits issued in the States of Arizona, Texas and Wyoming relating to exploration, pre-extraction, extraction and reclamation activities in the respective states where the deposits are held.

 

Reclamation deposits consisted of the following:

 

   April 30, 2016   July 31, 2015 
Palangana Mine  $1,102,981   $1,102,981 
Hobson Processing Facility   587,228    587,228 
Arizona   15,000    15,000 
Wyoming   817    816 
   $1,706,026   $1,706,025 

 

NOTE 6: OTHER LONG-TERM ASSET AND LIABILITY

 

On March 4, 2016, the Company entered into a share purchase and option agreement (the “SPOA”) with CIC Resources Inc. (the “Vendor”) pursuant to which the Company acquired (the “Acquisition”) all of the issued and outstanding shares of JDL Resources Inc. (“JDL”), a wholly-owned subsidiary of the Vendor, and was granted an option to acquire all of the issued and outstanding shares of CIC Resources (Paraguay) Inc. (“CIC”; the “Option”), another wholly-owned subsidiary of the Vendor.  JDL’s principal assets include a piece of land located in the department of Alto Parana in the Republic of Paraguay.  CIC is the beneficial owner of Paraguay Resources Inc. which is the 100% owner of certain mineral property concessions (the “Property”), which are located in the departments of Alto Parana and Canindeyú in the Republic of Paraguay.

 

Pursuant to the SPOA, the Company issued 1,333,560 restricted common shares in the capital of the Company and paid $50,000 in cash to complete the Acquisition. If the Company has paid or caused to have paid on the Vendor’s behalf certain maintenance payments and assessment work required to keep the Property in good standing as directed by the Vendor, during the one-year period following completion of the Acquisition (the “Option Period”), the Company may elect in its discretion to exercise the Option at any time, or if, in accordance with the SPOA, the Vendor satisfied certain conditions precedent to exercise, the Company will be deemed to have exercised the Option.  Upon exercise of the Option the Company is required to pay, subject to certain adjustments, $250,000 in cash to the Vendor and to grant to the Vendor a 1.5% net smelter returns royalty (the “Royalty”) on the Property as contemplated by a proposed net smelter returns royalty agreement (the “Royalty Agreement”) to be executed by the parties upon exercise of the Option.  Pursuant to the proposed Royalty Agreement, the Company has the right, exercisable at any time for a period of six years following exercise of the Option, to acquire one-half percent (0.5%) of the Royalty at a purchase price of $500,000.

 

In accordance with Accounting Standard Codification (“ASC”) 360, Property, Plant and Equipment, the acquisition of JDL was accounted for as an asset acquisition as it was determined that JDL’s operations do not meet the definition of a business as defined in ASC 805 Business Combinations.

 

 13 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

The fair value of the consideration paid and its allocation to the identifiable assets acquired and liabilities assumed are summarized as follows:

 

Consideration paid     
1,333,560 UEC common shares at $0.92 per share  $1,226,875 
Cash consideration   50,000 
Cash payable upon exercise the Option   250,000 
Transaction costs   63,090 
   $1,589,965 
      
Assets acquired and liabilities assumed     
Cash and cash equivalents  $3,916 
Prepaid expenses   3,804 
Land   344,376 
Other long-term asset (Option to acquire CIC)   1,553,388 
Due to CIC   (315,519)
   $1,589,965 

 

The Company holds a variable interest in CIC as a result of the Option; however, it is not the primary beneficiary due to the fact that the Company does not have the power over decisions that significantly affect CIC’s economic performance. Accordingly, UEC does not consolidate the results of CIC. Therefore, the other long-term asset effectively represents the amount paid in advance ($1,303,388) and to be paid upon the exercise of the option ($250,000) for the acquisition of CIC.

 

The Company’s maximum exposure to loss from the unconsolidated variable interest entity at April 30, 2016, which would arise if UEC is unable to exercise the Option, was approximately $1.3 million, representing the value of the Option (allocated fair value of $1,553,388), net of cash payable of $250,000 upon exercise of the Option.

 

The $250,000 cash payment which UEC will be required to make upon exercise of the Option has been recorded as a liability within Accounts Payable and Accrued Liabilities, and included in the consideration paid as it was determined to be probably that this payment will be made.

 

The liability of $315,519 represents the net amount due from JDL and its subsidiary to CIC and its subsidiary (formerly these entities were both part of the Vendor’s consolidated group). The amount has been classified as non-current as it has no stated terms of interest or repayment, and not expected to be settled within the next twelve months.

 

NOTE 7: DUE TO RELATED PARTIES AND RELATED PARTY TRANSACTIONS

 

During the three and nine months ended April 30, 2016, the Company incurred $30,134 and $128,727 (three and nine months ended April 30, 2015: $45,443 and $118,101), respectively, in general and administrative costs paid to a company controlled by a direct family member of a director and officer of the Company.

 

During the three months ended April 30, 2016, the Company issued 117,998 restricted common shares with a fair value of $109,738 as settlement of amounts owed to this company totaling $98,371. As a result, a loss on settlement of current liabilities of $11,367 was recognized in the condensed consolidated statements of operations and comprehensive loss. During the nine months ended April 30, 2015, the Company issued 15,000 restricted shares of common stock with a fair value of $18,150 to this company for consulting services included in general and administrative costs.

 

 14 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

At April 30, 2016, amounts owed to related parties totaled $897 (July 31, 2015: $14,660). These amounts are unsecured, non-interest bearing and due on demand.

 

NOTE 8: LONG-TERM DEBT

 

On February 9, 2016, the Company entered into a second amended and restated credit agreement (the “Second Amended and Restated Credit Agreement”) with its lenders, Sprott Resource Lending Partnership, CEF (Capital Markets) Limited and Resource Income Partners Limited Partnership (collectively, the “Lenders”), whereby the Company and the Lenders agreed to certain further amendments to the $20,000,000 senior secured credit facility (the “Credit Facility”), including the following terms:

 

·extension of the maturity date from July 31, 2017 to January 1, 2020;
·deferral of the monthly principal payments (each of which is equal to one-twelfth of the principal balance then outstanding) commencement date from July 31, 2016 to February 1, 2019;
·re-pricing and extension of the existing bonus warrants comprised of 2,600,000 share purchase warrants, each warrant exercisable for one share of common stock of the Company at an exercise price reduced from $2.50 to $1.35 per share until expiry, extended by a further one and a half years from July 30, 2018 to January 30, 2020, subject to accelerated exercise whereby, upon notification by the Company, the warrant holders will have 30 days to exercise their warrants should the ten trading-day volume-weighted average price of the Company’s shares equal or exceed $2.70;
·issuance of second extension fee shares equal to 4% of the principal balance outstanding or $800,000 paid to the Lenders by way of the issuance of 959,613 shares of common stock of the Company with a price per share based on a 10% discount to the five trading-day volume-weighted average price of the Company’s shares;
·payment of second extension anniversary fees to the Lenders on each of February 1, 2017, 2018 and 2019, of 5.5%, 4.5% and 4.5%, respectively, of the principal balance then outstanding, if any, payable at the option of the Company in cash or shares of the Company with a price per share calculated as a 10% discount to the five trading-day volume-weighted average price of the Company’s shares immediately prior to the applicable date; and
·maintenance at all times of a working capital ratio of not less than 1:1. Working capital ratio is calculated by dividing current assets by current liabilities, excluding the effects of principal payments on the determination of working capital.

 

Under the terms of the Second Amended and Restated Credit Agreement, the non-revolving Credit Facility has an interest rate of 8% per annum, with the underlying effective interest rate being 14.28%.

 

The Second Amended and Restated Credit Agreement supersedes, in their entirety, the prior Amended and Restated Credit Agreement dated and effective March 13, 2014 and the prior Credit Agreement dated and effective July 30, 2013.

 

The incremental value associated with the re-pricing and extension of the bonus warrants was determined to be $104,915 and has been recorded as an additional discount on long-term debt. The incremental value was determined using the Black-Scholes option pricing model with the following assumptions:

 

Expected Life in Years   3.98 
Expected Annual Volatility   71.10%
Expected Risk Free Interest Rate   1.00%
Expected Dividend Yield   0.00%

 

 15 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

As at April 30, 2016, long-term debt consisted of the following:

 

   April 30, 2016   July 31, 2015 
Principal amount  $20,000,000   $20,000,000 
Unamortized discount   (1,086,630)   (242,522)
Long-term debt, net of unamortized discount   18,913,370    19,757,478 

 

For the three and nine months ended April 30, 2016 and 2015, the amortization of debt discount totaled $277,417 and $960,807 (three and nine months ended April 30, 2015: $336,362 and $994,668), respectively, which was recorded as interest expense and included in the condensed consolidated statements of operations and comprehensive loss.

 

During the nine months ended April 30, 2016, prior to the execution of the Second Amended and Restated Credit Agreement, and pursuant to the terms of the Amended and Restated Credit Agreement dated and effective March 13, 2014, the Company paid bonus shares to its lenders through the issuance of 752,320 restricted shares with a fair value of $900,000, representing 4.5% of the $20,000,000 principal balance outstanding at July 31, 2015, which was recorded as a discount on long-term debt to be amortized using the effective interest rate over the life of the long-term debt.

 

The aggregate yearly maturities of long-term debt based on principal amounts outstanding at April 30, 2016 are as follows:

 

Fiscal 2016  $- 
Fiscal 2017   - 
Fiscal 2018   - 
Fiscal 2019   10,000,000 
Fiscal 2020   10,000,000 
Total  $20,000,000 

 

NOTE 9: ASSET RETIREMENT OBLIGATIONS

 

The Company’s asset retirement obligations relate to future remediation and decommissioning activities at the Palangana Mine and Hobson Processing Facility.

 

Balance, July 31, 2015  $3,926,846 
Revision in estimate of asset retirement obligations   (209,168)
Accretion   214,395 
Balance, April 30, 2016  $3,932,073 

 

During the nine months ended April 30, 2016, the ARO for the Palangana Mine were revised due to changes in the estimated timing of restoration and reclamation of the Palangana Mine. As a result, ARO liabilities associated with the Palangana Mine were reduced by $209,168, the corresponding mineral rights and properties were reduced by $24,787, and a credit amount of re-valuation of ARO totaling $184,381 was recognized as a result of a downward adjustment to fully depleted underlying mineral rights and properties, which was recorded against the mineral property expenditures for the Palangana Mine.

 

 

 16 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

The estimated amounts and timing of cash flows and assumptions used for ARO estimates are as follows:

 

   April 30, 2016   July 31, 2015 
Undiscounted amount of estimated cash flows  $6,650,255   $6,600,868 
           
Payable in years   2.1 to 15    2.5 to 15 
Inflation rate   0.90% to 2.25%   2.02% to 2.25%
Discount rate   5.15% to 8.00%   6.56% to 8.00%

 

The undiscounted amounts of estimated cash flows for the next five fiscal years and beyond are as follows:

 

Fiscal 2016  $- 
Fiscal 2017   139,052 
Fiscal 2018   414,058 
Fiscal 2019   667,984 
Fiscal 2020   620,673 
Remaining balance   4,808,488 
   $6,650,255 

 

NOTE 10: CAPITAL STOCK

 

Equity Financing

 

During Fiscal 2014, the Company filed a Form S-3 “Shelf” Registration Statement effective January 10, 2014 (the “2014 Shelf”) providing for the public offer and sale of certain securities of the Company from time to time, at its discretion, up to an aggregate offering of $100 million.

 

On March 10, 2016, the Company completed a registered offering of 12,364,704 units at a price of $0.85 per unit for gross proceeds of $10,510,000 pursuant to a prospectus supplement to the 2014 Shelf. Each unit is comprised of one share of the Company and half of one share purchase warrant, with each whole warrant being exercisable at a price of $1.20 to purchase one share of the Company totaling 6,182,351 for a three year period from the date of issuance. The Company issued share purchase warrants to agents as part of share issuance costs to purchase 411,997 shares of the Company exercisable at a price of $1.20 per share also for a three year period from the date of issuance.

 

The shares were valued at the Company’s closing price of $0.81 per share at March 10, 2016. The share purchase warrants were valued using the Black-Scholes option pricing model with the following assumptions:

 

Expected Risk Free Interest Rate   1.11%
Expected Annual Volatility   74.34%
Expected Contractual Life in Years   3.00 
Expected Annual Dividend Yield   0.00%

 

 17 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

The net proceeds from the 2014 Shelf equity financing were allocated to the fair values of the shares and share purchase warrants as presented below:

  

Fair Value of Shares  $10,015,410 
Fair Value of Share Purchase Warrants   1,938,995 
Total Fair Value Before Allocation to Net Proceeds  $11,954,405 
      
Gross Proceeds  $10,510,000 
Share Issuance Costs - Cash   (525,482)
Net Cash Proceeds Received  $9,984,518 
      
Relative Fair Value Allocation to:     
Shares  $8,365,038 
Share Purchase Warrants   1,619,480 
   $9,984,518 

 

At April 30, 2016, a total of $35.1 million of the 2014 Shelf was utilized through the following registered offerings and sales of units, with a remaining available balance of $64.9 million under the 2014 Shelf.

 

·on June 25, 2015: $10.0 million in gross proceeds through an offering of units consisting of the Company’s shares and share purchase warrants and $6.7 million representing the aggregate exercise price of those share purchase warrants and agents’ share purchase warrants should they be exercised in full; and

 

·on March 10, 2016: $10.5 million in gross proceeds through an offering of units consisting of the Company’s shares and share purchase warrants and $7.9 million representing the aggregate exercise price of those share purchase warrants and agents’ share purchase warrants should they be exercised in full.

 

Share Transactions

 

A summary of the Company’s share transactions for the three and nine months ended April 30, 2016 are as follows:

 

   Common   Value per Share   Issuance 
Period / Description  Shares Issued   Low   High   Value 
Balance, July 31, 2015   97,834,087                
Bonus Shares for Credit Facility   752,320   $1.20   $1.20   $900,000 
Consulting Services   274,982    1.03    1.38    305,594 
Share Compensation   33,315    1.00    1.12    35,264 
Balance, October 31, 2015   98,894,704                
Consulting Services   581,421    0.72    1.12    608,179 
Share Compensation   71,588    1.06    1.08    76,236 
Options Exercised   682,167    0.33    0.33    225,115 
Balance, January 31, 2016   100,229,880                
Second Extension Fee Shares for Credit Facility   959,613    0.83    0.83    800,000 
Settlement of Current Liabilities   487,574    0.93    0.93    453,444 
Equity Financing   12,364,704    0.85    0.85    10,510,000 
Asset Acquisition   1,333,560    0.92    0.92    1,226,875 
Consulting Services   514,440    0.73    0.93    424,316 
Share Compensation   202,884    0.75    0.96    167,830 
Balance, April 30, 2016   116,092,655                

 

 18 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

Share Purchase Warrants

 

A summary of share purchase warrants outstanding and exercisable at April 30, 2016 are as follows:

 

Weighted
Average
Exercise Price
   Number of Warrants
Outstanding
   Expiry Date  Weighted Average
Remaining Contractual
Life (Years)
 
$1.20    6,594,348   March 10, 2019   2.86 
 1.35    2,600,000   January 30, 2020   3.75 
 1.95    50,000   June 3, 2018   2.09 
 2.12    2,850,000   June 25, 2018   2.15 
 2.60    1,859,524   October 23, 2016   0.48 
$1.61    13,953,872       2.56 

 

Stock Options

 

At April 30, 2016, the Company had one stock option plan, the 2015 Stock Incentive Plan (the “2015 Plan”). The 2015 Plan provides for up to 9,600,250 shares of the Company that may be issued pursuant to awards that may be granted together with an additional 10,569,301 shares of the Company that may be issued pursuant to stock options previously granted under the Company’s prior 2014 Stock Incentive Plan (the “2014 Plan”). The 2015 Plan supersedes and replaces the Company’s prior 2014 Plan, which superseded and replaced the Company’s prior 2013, 2009 and 2006 Stock Incentive Plans, such that no further shares are issuable under those prior plans.

 

A summary of stock options granted by the Company during the nine months ended April 30, 2016, including corresponding grant date fair values and assumptions using the Black Scholes option pricing model is as follows:

 

   Options   Exercise   Term   Fair   Expected   Risk-Free   Dividend   Expected 
Date  Issued   Price   (Years)   Value   Life (Years)   Interest Rate   Yield   Volatility 
August 7, 2015   105,000   $1.32    5   $68,824    2.90    1.04%   0.00%   77.17%
October 14, 2015   1,000,000    1.14    5    563,195    2.90    0.81%   0.00%   77.01%
January 12, 2016   300,000    0.98    5    145,902    2.90    1.15%   0.00%   76.96%
Total   1,405,000             $777,921                     

 

A continuity schedule of outstanding stock options for the underlying common shares for the nine months ended April 30, 2016 is as follows:

 

   Number of Stock Options   Weighted Average Exercise Price 
Balance, July 31, 2015   10,581,975   $1.38 
Issued   1,105,000    1.16 
Forfeited   (5,000)   1.32 
Balance, October 31, 2015   11,681,975    1.36 
Issued   300,000    0.98 
Exercised   (682,167)   0.33 
Forfeited   (180,000)   1.32 
Expired   (1,950)   5.90 
Balance, January 31, 2016   11,117,858    1.42 
Forfeited   (72,500)   1.81 
Balance, April 30, 2016   11,045,358   $1.41 

 

At April 30, 2016, the aggregate intrinsic value under the provisions of ASC 718 of all outstanding stock options was estimated at $439,068 (vested: $439,068 and unvested: $Nil).

 

At April 30, 2016, unrecognized stock-based compensation expense related to the unvested portion of stock options granted under the Company’s 2015 Plan totaled $226,003 to be recognized over the next 0.76 years.

 

 19 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

A summary of stock options outstanding and exercisable at April 30, 2016 is as follows:


   Options Outstanding   Options Exercisable 
       Weighted   Weighted Average       Weighted   Weighted Average 
       Average   Remaining       Average   Remaining 
Range of  Outstanding at   Exercise   Contractual Term   Exercisable at   Exercise   Contractual Term 
Exercise Prices  April 30, 2016   Price   (Years)   April 30, 2016   Price   (Years) 
$0.45 to $0.96   1,269,634   $0.47    1.56    1,269,634   $0.47    1.56 
$0.97 to $2.45   8,840,000    1.35    3.54    8,057,500    1.37    3.44 
$2.46 to $5.70   935,724    3.29    4.09    935,724    3.29    4.09 
    11,045,358   $1.41    3.36    10,262,858   $1.44    3.27 

  

Stock-Based Compensation

 

A summary of stock-based compensation expense is as follows:

 

   Three Months Ended April 30   Nine Months Ended April 30 
   2016   2015   2016   2015 
Stock-Based Compensation for Consultants                    
Common stock issued for consulting services  $470,549   $502,854   $1,429,324   $1,380,279 
Stock options issued to consultants   (4,461)   346,995    66,317    721,430 
    466,088    849,849    1,495,641    2,101,709 
Stock-Based Compensation for Management                    
Common stock issued to management   45,299    -    81,495    - 
Stock options issued to management   195,464    263,306    640,789    1,424,585 
    240,763    263,306    722,284    1,424,585 
Stock-Based Compensation for Employees                    
Common stock issued to employees   76,299    -    106,602    - 
Stock options issued to employees   15,710    204,723    163,124    1,102,250 
    92,009    204,723    269,726    1,102,250 
   $798,860   $1,317,878   $2,487,651   $4,628,544 

 

NOTE 11: LOSS PER SHARE

 

The following table reconciles the weighted average number of shares used in the calculation of the basic and diluted loss per share:

 

   Three Months Ended April 30,   Nine Months Ended April 30, 
   2016   2015   2016   2015 
Numerator                    
Net Loss for the Period  $(3,679,055)  $(5,347,729)  $(13,552,594)  $(17,949,496)
                     
Denominator                    
Basic Weighted Average Number of Shares   109,710,985    92,034,908    102,588,834    91,683,568 
Dilutive Stock Options and Warrants   -    -    -    - 
Diluted Weighted Average Number of Shares   109,710,985    92,034,908    102,588,834    91,683,568 
                     
Net Loss per Share, Basic and Diluted  $(0.03)  $(0.06)  $(0.13)  $(0.20)

 

For the three and nine months ended April 30, 2016 and 2015, all outstanding stock options and share purchase warrants were excluded from the calculation of the diluted loss per share since the Company reported net losses for those periods and their effects would be anti-dilutive.

 

 20 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

NOTE 12: SEGMENTED INFORMATION

 

The Company currently operates in a single reportable segment and is focused on uranium mining and related activities, including exploration, pre-extraction, extraction and processing of uranium concentrates.

 

At April 30, 2016, long-term assets located in the U.S. totaled $33,436,732, or 69% of the Company’s total long-term assets of $48,443,360.

 

The table below provides a breakdown of the Company’s long-term assets by geographic segments:

 

   April 30, 2016 
   United States             
Balance Sheet Items  Texas   Arizona   Other States   Canada   Paraguay   Total 
Mineral Rights and Properties  $13,369,394   $10,891,861   $821,276   $-   $13,080,555   $38,163,086 
Property, Plant and Equipment   6,648,175    -    -    16,965    355,720    7,020,860 
Reclamation Deposits   1,690,209    15,000    817    -    -    1,706,026 
Other Long-Term Assets   -    -    -    -    1,553,388    1,553,388 
Total Long-Term Assets  $21,707,778   $10,906,861   $822,093   $16,965   $14,989,663   $48,443,360 

 

   July 31, 2015 
   United States     
Balance Sheet Items  Texas   Arizona   Other States   Canada   Paraguay   Total 
Mineral Rights and Properties  $13,555,492   $10,891,861   $910,059   $-   $13,080,555   $38,437,967 
Property, Plant and Equipment   6,926,682    -    -    7,502    14,463    6,948,647 
Reclamation Deposits   1,690,209    15,000    816    -    -    1,706,025 
Total Long-Term Assets  $22,172,383   $10,906,861   $910,875   $7,502   $13,095,018   $47,092,639 

 

 21 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

The tables below provide a breakdown of the Company’s operating results by geographic segments for the three and nine months ended April 30, 2016. All intercompany transactions have been eliminated.

 

   Three Months Ended April 30, 2016 
   United States             
Statement of Operations  Texas   Arizona   Other States   Canada   Paraguay   Total 
Sales  $-   $-   $-   $-   $-   $- 
                               
Costs and Expenses:                              
Cost of sales   -    -    -    -    -    - 
Mineral property expenditures   495,830    3,982    881    -    225,275    725,968 
General and administrative   1,426,110    66,534    989    514,853    (3,021)   2,005,465 
Depreciation, amortization and accretion   200,732    -    750    2,385    1,621    205,488 
    2,122,672    70,516    2,620    517,238    223,875    2,936,921 
Loss from operations   (2,122,672)   (70,516)   (2,620)   (517,238)   (223,875)   (2,936,921)
Other income (expenses)   (745,888)   (4,663)   -    31    6    (750,514)
Loss before income taxes  $(2,868,560)  $(75,179)  $(2,620)  $(517,207)  $(223,869)  $(3,687,435)

  

   Three Months Ended April 30, 2015 
   United States             
Statement of Operations  Texas   Arizona   Other States   Canada   Paraguay   Total 
Sales  $-   $-   $-   $-   $-   $- 
                               
Costs and Expenses:                              
Cost of sales   -    -    -    -    -    - 
Mineral property expenditures   786,935    50,119    35,199    -    173,589    1,045,842 
General and administrative   2,400,403    51,889    4,368    707,481    3,755    3,167,896 
Depreciation, amortization and accretion   368,448    -    501    2,741    2,392    374,082 
    3,555,786    102,008    40,068    710,222    179,736    4,587,820 
Loss from operations   (3,555,786)   (102,008)   (40,068)   (710,222)   (179,736)   (4,587,820)
Other income (expenses)   (759,273)   (4,640)   -    -    169    (763,744)
Loss before income taxes  $(4,315,059)  $(106,648)  $(40,068)  $(710,222)  $(179,567)  $(5,351,564)

 

 22 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

  

   Nine Months Ended April 30, 2016 
   United States             
Statement of Operations  Texas   Arizona   Other States   Canada   Paraguay   Total 
Sales  $-   $-   $-   $-   $-   $- 
                               
Costs and Expenses:                              
Cost of sales   -    -    -    -    -    - 
Mineral property expenditures   2,347,348    213,885    133,031    -    714,549    3,408,813 
General and administrative   5,074,713    141,526    2,652    1,865,839    1,939    7,086,669 
Depreciation, amortization and accretion   667,080    -    2,250    6,017    5,226    680,573 
Impairment loss on mineral properties   -    -    86,535    -    -    86,535 
    8,089,141    355,411    224,468    1,871,856    721,714    11,262,590 
Loss from operations   (8,089,141)   (355,411)   (224,468)   (1,871,856)   (721,714)   (11,262,590)
Other income (expenses)   (2,299,582)   (14,198)   -    849    17    (2,312,914)
Loss before income taxes  $(10,388,723)  $(369,609)  $(224,468)  $(1,871,007)  $(721,697)  $(13,575,504)

 

   Nine Months Ended April 30, 2015 
   United States             
Statement of Operations  Texas   Arizona   Other States   Canada   Paraguay   Total 
Sales  $-   $-   $-   $-   $-   $- 
                               
Costs and Expenses:                              
Cost of sales   -    -    -    -    -    - 
Mineral property expenditures   3,431,826    207,586    191,718    -    729,111    4,560,241 
General and administrative   7,456,500    148,766    18,393    2,069,664    18,610    9,711,933 
Depreciation, amortization and accretion   1,420,996    -    1,968    9,238    8,606    1,440,808 
    12,309,322    356,352    212,079    2,078,902    756,327    15,712,982 
Loss from operations   (12,309,322)   (356,352)   (212,079)   (2,078,902)   (756,327)   (15,712,982)
Other income (expenses)   (2,249,325)   (15,018)   -    (120)   484    (2,263,979)
Loss before income taxes  $(14,558,647)  $(371,370)  $(212,079)  $(2,079,022)  $(755,843)  $(17,976,961)

 

NOTE 13: SUPPLEMENTAL CASH FLOW INFORMATION

 

During the nine months ended April 30, 2016 and 2015, the Company issued 1,370,843 and 891,273 restricted shares with a fair value of $1,338,091 and $1,380,279, respectively, for consulting services.

 

During the nine months ended April 30, 2016, the Company issued 307,787 shares with a fair value of $279,330 as compensation to certain management, employees and consultants of the Company under the 2015 Plan.

 

During the nine months ended April 30, 2016 and 2015, the Company paid $1,217,778 and $1,213,333, respectively, in cash for interest on its long-term debt.

 

During the nine months ended April 30, 2016, the Company issued 487,574 shares with a fair value of $453,444 as settlement of certain of the Company’s accounts payable totaling $406,476.

 

During the nine months ended April 30, 2016, the Company entered into a SPOA with CIC Resources Inc., pursuant to which the Company acquired all of the issued and outstanding shares of JDL Resources Inc. As consideration, the Company issued 1,333,560 restricted common shares and paid $50,000 in cash.

 

 23 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

NOTE 14: COMMITMENTS AND CONTINGENCIES

 

The Company is renting or leasing various office or storage space located in the United States, Canada and Paraguay with total monthly payments of $18,484. Office lease agreements expire between May 2017 and March 2021 for the United States and Canada.

 

The aggregate minimum payments over the next five fiscal years are as follows:

 

Fiscal 2016  $55,307 
Fiscal 2017   217,867 
Fiscal 2018   199,722 
Fiscal 2019   88,979 
Fiscal 2020   89,614 
All subsequent years   59,743 
   $711,232 

 

The Company is committed to pay its key executives a total of $750,000 per year for various management services.

 

The Company is subject to ordinary routine litigation incidental to its business. Except as disclosed below, the Company is not aware of any material legal proceedings pending or that have been threatened against the Company.

 

On or about March 9, 2011, the Texas Commission on Environmental Quality (the “TCEQ”) granted the Company’s applications for a Class III Injection Well Permit, Production Area Authorization and Aquifer Exemption for its Goliad Project.  On or about December 4, 2012, the U.S. Environmental Protection Agency (the “EPA”) concurred with the TCEQ issuance of the Aquifer Exemption permit (the “AE”).  With the receipt of this concurrence, the final authorization required for uranium extraction, the Goliad Project achieved fully-permitted status.  On or about May 24, 2011, a group of petitioners, inclusive of Goliad County, appealed the TCEQ action to the 250th District Court in Travis County, Texas.  A motion filed by the Company to intervene in this matter was granted. The petitioners’ appeal lay dormant until on or about June 14, 2013, when the petitioners filed their initial brief in support of their position.  On or about January 18, 2013, a different group of petitioners, exclusive of Goliad County, filed a petition for review with the Court of Appeals for the Fifth Circuit in the United States (the “Fifth Circuit”) to appeal the EPA’s decision.  On or about March 5, 2013, a motion filed by the Company to intervene in this matter was granted.  The parties attempted to resolve both appeals, to facilitate discussions and avoid further legal costs. The parties jointly agreed, through mediation initially conducted through the Fifth Circuit on or about August 8, 2013, to abate the proceedings in the State District Court. On or about August 21, 2013, the State District Court agreed to abate the proceedings.  The EPA subsequently filed a motion to remand without vacatur with the Fifth Circuit wherein the EPA's stated purpose was to elicit additional public input and further explain its rationale for the approval.  In requesting the remand without vacatur, which would allow the AE to remain in place during the review period, the EPA denied the existence of legal error and stated that it was unaware of any additional information that would merit reversal of the AE.  The Company and the TCEQ filed a request to the Fifth Circuit for the motion to remand without vacatur, and if granted, to be limited to a 60-day review period.  On December 9, 2013, by way of a procedural order from a three-judge panel of the Fifth Circuit, the Court granted the remand without vacatur and initially limited the review period to 60 days. In March of 2014, at the EPA’s request, the Fifth Circuit extended the EPA’s time period for review and additionally, during that same period, the Company conducted a joint groundwater survey of the site, the result of which reaffirmed the Company’s previously filed groundwater direction studies. On or about June 17, 2014, the EPA reaffirmed its earlier decision to uphold the granting of the Company’s existing AE, with the exception of a northwestern portion containing less than 10% of the uranium resource which was withdrawn, but not denied, from the AE area until additional information is provided in the normal course of mine development. On or about September 9, 2014, the petitioners filed a status report with the State District Court which included a request to remove the stay agreed to in August 2013 and to set a briefing schedule (the “Status Report”). In that Status Report, the petitioners also stated that they had decided not to pursue their appeal at the Fifth Circuit. The Company continues to believe that the pending appeal is without merit and is continuing as planned towards uranium extraction at its fully-permitted Goliad Project.

 

 24 

 

 

URANIUM ENERGY CORP.
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
April 30, 2016
(Unaudited)
 

 

On or about April 3, 2012, the Company received notification of a lawsuit filed in the State of Arizona, in the Superior Court for the County of Yavapai, by certain petitioners (the “Plaintiffs”) against a group of defendants, including the Company and former management and board members of Concentric Energy Corp. (“Concentric”). The lawsuit asserts certain claims relating to the Plaintiffs’ equity investments in Concentric, including allegations that the former management and board members of Concentric engaged in various wrongful acts prior to and/or in conjunction with the merger of Concentric. The lawsuit originally further alleged that the Company was contractually liable for liquidated damages arising from a pre-merger transaction which the Company previously acknowledged and recorded as an accrued liability, and which portion of the lawsuit was settled in full by a cash payment of $149,194 to the Plaintiffs and subsequently dismissed. The court dismissed several other claims set forth in the Plaintiffs’ initial complaint, but granted the Plaintiffs leave to file an amended complaint.  The court denied a subsequent motion to dismiss the amended complaint, finding that the pleading met the minimal pleading requirements under the applicable procedural rules.  In October 2013, the Company filed a formal response denying liability for any of the Plaintiffs’ remaining claims. The court set the case for a four-week jury trial that was to take place in Yavapai County, Arizona, in April 2016.  In November 2015, after the completion of discovery, the Company and the remaining defendants filed motions for summary judgment, seeking to dismiss all of the Plaintiffs’ remaining claims.  While those motions were pending, the parties reached a settlement agreement with respect to all claims asserted by the Plaintiffs in that lawsuit.  A formal settlement and release agreement was subsequently executed, pursuant to which all of the Plaintiffs’ claims in the Arizona lawsuit were dismissed with prejudice.  Pursuant to the terms of the settlement agreement, the Defendants collectively paid $500,000 to the Plaintiffs, of which $50,000 will be paid by the Company.

 

On June 1, 2015, the Company received notice that Westminster Securities Corporation (“Westminster”) filed a suit in the United States District Court for the Southern District of New York, alleging a breach of contract relating to certain four-year warrants issued by Concentric in December 2008.  Although the Concentric warrants expired by their terms on December 31, 2012, Westminster bases its claim upon transactions allegedly occurring prior to UEC’s merger with Concentric.  The Company believes that this claim lacks merit and intends to vigorously defend the same.

 

On or about June 29, 2015, Heather M. Stephens filed a class action complaint against the Company and two of its executive officers in the United States District Court, Southern District of Texas, with an amended class action complaint filed on November 16, 2015, (the “Securities Case”) seeking unspecified damages and alleging the defendants violated Section 17(b) of the Securities Act of 1933 and Sections 10(b) and 20(a) of the Securities Exchange Act of 1934. The Company has filed a motion to dismiss.

 

On or about September 10, 2015, John Price filed a stockholder derivative complaint on behalf of the Company against the Company’s Board of Directors, executive management and three of its vice presidents in the United States District Court, Southern District of Texas, with an amended stockholder derivative complaint filed on December 4, 2015, (the “Federal Derivative Case”) seeking unspecified damages on behalf of the Company against the defendants for allegedly breaching their fiduciary duties to the Company with respect to the allegations in the Securities Case. The Company has filed a motion to dismiss.

 

On or about October 2, 2015, Marnie W. McMahon filed a stockholder derivative complaint on behalf of the Company against the Company’s Board of Directors, executive management and three of its vice presidents in the District Court of Nevada (the “Nevada Derivative Case”) (collectively with the Federal Derivative Case, the “Derivative Cases”) seeking unspecified damages on behalf of the Company against the defendants for allegedly breaching their fiduciary duties to the Company with respect to the allegations in the Securities Case. On January 21, 2016, the court granted the Company’s motion to stay the Nevada Derivative Case pending the outcome of the Federal Derivative Case.

 

The Company believes that the Securities Case and the Derivative Cases are without merit and intends to defend vigorously against them.

 

 25 

 

  

URANIUM ENERGY CORP.

NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

April 30, 2016

(Unaudited)

 

 

 

The Company’s Board of Directors received a shareholder demand letter dated September 10, 2015 relating to the allegations in the Securities Case (the “Shareholder Demand”). The letter demands that the Board of Directors initiate an action against the Company’s Board of Directors and two of its executive officers to recover damages allegedly caused to the Company. The Board of Directors is reviewing the Shareholder Demand to determine the appropriate course of action.

 

At any given time, the Company may enter into negotiations to settle outstanding legal proceedings and any resulting accruals will be estimated based on the relevant facts and circumstances applicable at that time.  The Company does not expect that such settlements will, individually or in the aggregate, have a material effect on its financial position, results of operation.

 

 26 

 

  

Item 2.      Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

The following management’s discussion and analysis of the Company’s financial condition and results of operations (“MD&A”) contain forward-looking statements that involve risks, uncertainties and assumptions including, among others, statements regarding our capital needs, business plans and expectations. In evaluating these statements, you should consider various factors, including the risks, uncertainties and assumptions set forth in reports and other documents we have filed with or furnished to the SEC, including, without limitation, this Form 10-Q Quarterly Report for the three and nine months ended April 30, 2016 and our Form 10-K Annual Report for the fiscal year ended July 31, 2015 including the consolidated financial statements and related notes contained therein. These factors, or any one of them, may cause our actual results or actions in the future to differ materially from any forward-looking statement made in this document. Refer to “Cautionary Note Regarding Forward-Looking Statements” as disclosed in our Form 10-K Annual Report for the fiscal year ended July 31, 2015 and Item 1A. Risk Factors under Part II - Other Information of this Quarterly Report.

 

Introduction

 

This MD&A is focused on material changes in our financial condition from July 31, 2015, our most recently completed year-end, to April 30, 2016 and our results of operations for the three and nine months ended April 30, 2016 and 2015, and should be read in conjunction with Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations as contained in our Form 10-K Annual Report for the fiscal year ended July 31, 2015.

 

Business

 

We operate in a single reportable segment and since 2004, as more fully described in our Form 10-K Annual Report for the fiscal year ended July 31, 2015, we have been engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing on uranium projects located in the United States and Paraguay.

 

We utilize in-situ recovery (“ISR”) mining where possible which we believe, when compared to conventional open pit or underground mining, requires lower capital and operating expenditures with a shorter lead time to extraction and a reduced impact on the environment. We have one uranium mine located in the State of Texas, the Palangana Mine, which utilizes ISR mining and commenced extraction of uranium concentrates (“U3O8”), or yellowcake, in November 2010. We have one uranium processing facility located in the State of Texas, the Hobson Processing Facility, which processes material from the Palangana Mine into drums of U3O8, our only sales product and source of revenue, for shipping to a third-party storage and sales facility. At April 30, 2016, we had no uranium supply or “off-take” agreements in place.

 

Our fully-licensed and 100%-owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson Processing Facility acts as the central processing site (the “hub”) for our Palangana Mine and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”). The Hobson Processing Facility has a physical capacity to process uranium-loaded resins up to a total of two million pounds of U3O8 annually and is licensed to process up to one million pounds of U3O8 annually.

 

We also hold certain mineral rights in various stages in the States of Arizona, Colorado, New Mexico, Texas and Wyoming and in the Republic of Paraguay, many of which are located in historically successful mining areas and have been the subject of past exploration and pre-extraction activities by other mining companies. We do not expect, however, to utilize ISR mining for all of our mineral rights in which case we would expect to rely on conventional open pit and/or underground mining techniques.

 

Our operating and strategic framework is based on expanding our uranium extraction activities, which includes advancing certain uranium projects with established mineralized materials towards uranium extraction and establishing additional mineralized materials on our existing uranium projects or through the acquisition of additional uranium projects.

 

During the three and nine months ended April 30, 2016, uranium extraction at PAA-1, 2 and 3 of the Palangana Mine continued to operate at a reduced pace since implementing our strategic plan in September 2013, to align our operations to a weak uranium market in a challenging post-Fukushima environment. This strategy has included the deferral of major pre-extraction expenditures and remaining in a state of operational readiness in anticipation of a recovery in uranium prices.

 

 27 

 

 

During the nine months ended April 30, 2016, the Company

 

·entered into the Second Amended and Restated Agreement with its lenders and extended the $20,000,000 senior secured credit facility by deferring required principal payments to February 1, 2019 and by extending the maturity date to January 1, 2020;
·completed a registered offering of 12,364,704 units at a price of $0.85 per unit for gross proceeds of $10,510,000;
·completed an asset acquisition through issuance of 1,333,560 restricted common shares and payment of $50,000 in cash;
·continued to advance development of Production Area Authorization (“PAA”) 4 of the Palangana Mine;
·continued to advance exploration and permitting activities at the Burke Hollow Project;
·continued permitting work at the Anderson Project;
·appointed former United States Energy Secretary Spencer Abraham as Executive Chairman of the Company’s Board of Directors; and
·appointed Pat Obara as the Company’s Chief Financial Officer.

 

Mineral Rights and Properties

 

The following is a summary of significant activities by project for the nine months ended April 30, 2016:

 

Texas: Palangana Mine

 

During the nine months ended April 30, 2016, we continued with our strategic plan for reduced operations implemented in Fiscal 2014 and continued reduced operations at the Palangana Mine to capture residual pounds of U3O8 only.

 

Wellfield design for the first module at PAA-4, which is fully-permitted for uranium extraction, continued to advance. At April 30, 2016, a total of 214 drill holes have been completed relating to PAA-4 for mineral trend exploration, delineation and monitor wells.

 

Texas: Burke Hollow Project

 

During the nine months ended April 30, 2016, 49 exploration holes totaling 25,020 feet were drilled at the Burke Hollow Project to depths ranging from 420 feet to 640 feet, with an average depth of 511 feet. At April 30, 2016, a total of 575 exploration holes, including 30 regional baseline monitor wells, totaling 271,520 feet have been drilled to depths ranging from160 feet to 1,100 feet, with an average depth of 472 feet.

 

With the recent issuance of two Class I disposal well permits, permitting activities continued on the Mine Area, Aquifer Exemption and Radioactive Material License applications, which remain under technical review. An ecological assessment for the eastern trend extension was scheduled for the spring of 2016 anticipating wellfield expansion of the eastern trend.

 

Arizona: Anderson Project

 

During the nine months ended April 30, 2016, the Company completed work on the Bureau of Land Management (“BLM”) Notice of Intent permit, which was submitted for review in December 2015, and approved by the BLM in March 2016.

 

Asset Acquisition

 

On March 4, 2016, the Company entered into a share purchase and option agreement (the “SPOA”) with CIC Resources Inc. (the “Vendor”) pursuant to which the Company acquired (the “Acquisition”) all of the issued and outstanding shares of JDL Resources Inc. (“JDL”), a wholly-owned subsidiary of the Vendor, and was granted an option to acquire all of the issued and outstanding shares of CIC Resources (Paraguay) Inc. (“CIC”; the “Option”), another wholly-owned subsidiary of the Vendor.  JDL’s principal assets include a piece of land located in the department of Alto Parana in the Republic of Paraguay.  CIC is the beneficial owner of Paraguay Resources Inc. which is the 100% owner of certain mineral property concessions (the “Property”), which are located in the departments of Alto Parana and Canindeyú in the Republic of Paraguay.

 

 28 

 

  

Pursuant to the SPOA, the Company issued 1,333,560 restricted common shares in the capital of the Company and paid $50,000 in cash to complete the Acquisition. If the Company has paid or caused to have paid on the Vendor’s behalf certain maintenance payments and assessment work required to keep the Property in good standing as directed by the Vendor, during the one-year period following completion of the Acquisition (the “Option Period”), the Company may elect in its discretion to exercise the Option at any time, or if, in accordance with the SPOA, the Vendor satisfied certain conditions precedent to exercise, the Company will be deemed to have exercised the Option.  Upon exercise of the Option the Company is required to pay, subject to certain adjustments, $250,000 in cash to the Vendor and to grant to the Vendor a 1.5% net smelter returns royalty (the “Royalty”) on the Property as contemplated by a proposed net smelter returns royalty agreement (the “Royalty Agreement”) to be executed by the parties upon exercise of the Option.  Pursuant to the proposed Royalty Agreement, the Company has the right, exercisable at any time for a period of six years following exercise of the Option, to acquire one-half percent (0.5%) of the Royalty at a purchase price of $500,000.

 

Refer to Note 6: Other Long-Term Asset and Liability of the Notes to the Consolidated Financial Statements for the three and nine months ended April 30, 2016.

 

Results of Operations

 

For the three and nine months ended April 30, 2016, we recorded net losses of $3,679,055 ($0.03 per share) and $13,552,594 ($0.13 per share), respectively. Costs and expenses during the three and nine months ended April 30, 2016 were $2,936,921 and $11,262,590, respectively.

 

For the three and nine months ended April 30, 2015, we recorded a net loss of $5,347,729 ($0.06 per share) and $17,949,496 ($0.20 per share), respectively. Costs and expenses during the three and nine months ended April 30, 2015 were $4,587,820 and $15,712,982, respectively.

 

Uranium Extraction Activities

 

During the three and nine months ended April 30, 2016, we continued with our strategic plan for reduced operations implemented in Fiscal 2014 and continued reduced operations at the Palangana Mine to capture residual pounds of U3O8 only.  As a result, no U3O8 extraction or processing costs were capitalized to inventories during the three and nine months ended April 30, 2016.

 

During the three and nine months ended April 30, 2015, the Palangana Mine extracted 2,000 and 13,000 pounds of U3O8, respectively, while the Hobson Processing Facility processed 3,000 and 14,000 pounds of U3O8, respectively.

 

At April 30, 2016, the total value of inventories was $251,999, which remained unchanged from July 31, 2015.

 

Costs and Expenses

 

For the three and nine months ended April 30, 2016, costs and expenses totaled $2,936,921 and $11,262,590, comprised of mineral property expenditures of $725,968 and $3,408,813, general and administrative expenditures of $2,005,465 and $7,086,669, depreciation, amortization and accretion of $205,488 and $680,573, and impairment loss on mineral properties of $Nil and $86,535, respectively. During the three and nine months ended April 30, 2016, no sales of U3O8 were generated, therefore no corresponding cost of sales were recorded.

 

For the three and nine months ended April 30, 2015, costs and expenses totaled $4,587,820 and $15,712,982, comprised of mineral property expenditures of $1,045,842 and $4,560,241, general and administrative of $3,167,896 and $9,711,933 and depreciation, amortization and accretion of $374,082 and $1,440,808, respectively. No impairment loss on mineral property was recorded. During the three and nine months ended April 30, 2015, no sales of U3O8 were generated, therefore no corresponding cost of sales were recorded.

 

 29 

 

  

Mineral Property Expenditures

 

During the three and nine months ended April 30, 2016, mineral property expenditures totaled $725,968 and $3,408,813, respectively, comprised of expenditures relating to permitting, property maintenance, exploration and pre-extraction activities and all other non-extraction related activities on our uranium projects. During the three and nine months ended April 30, 2016, a credit amount due to re-valuation of ARO totaling $184,381 was recognized as a result of a descending ARO adjustment to fully depleted underlying mineral rights and properties, which was recorded against the mineral property expenditures.

 

During the three and nine months ended April 30, 2016, mineral property expenditures included expenditures directly related to maintaining operational readiness and permitting compliance of $349,367 and $1,270,165, respectively, for the Palangana Mine and Hobson Processing Facility.

 

During the three and nine months ended April 30, 2015, mineral property expenditures totaled $1,045,842 and $4,560,241 respectively, comprised of expenditures relating to permitting, property maintenance, exploration, pre-extraction and all other non-extraction related activities on our uranium projects. Additionally, these amounts include uranium extraction expenditures directly related to maintaining operational readiness and permitting compliance of $497,846 and $1,456,206, respectively, for the Palangana Mine and Hobson Processing Facility.

 

The following table provides mineral property expenditures on our projects for the periods indicated:

 

   Three Months Ended April 30,   Nine Months Ended April 30, 
   2016   2015   2016   2015 
Mineral Property Expenditures                    
Palangana Mine  $280,345   $500,535   $1,031,625   $1,621,391 
Goliad Project   26,848    25,631    71,679    79,924 
Burke Hollow Project   48,409    94,702    974,661    1,235,250 
Longhorn Project   247    22,276    4,620    52,999 
Salvo Project   4,622    16,751    21,697    39,590 
Anderson Project   3,564    50,142    170,780    173,564 
Workman Creek Project   418    -    32,109    31,300 
Slick Rock Project   -    2,924    53,861    52,708 
Yuty Project   89,246    41,274    291,788    301,035 
Coronel Oviedo Project   136,031    132,315    422,763    428,077 
Other Mineral Property Expenditures   136,238    159,292    517,611    544,403 
Re-valuation of Asset Retirement Obligations   -    -    (184,381)   - 
   $725,968   $1,045,842   $3,408,813   $4,560,241 

 

General and Administrative

 

During the three and nine months ended April 30, 2016, general and administrative expenses totaled $2,005,465 and $7,086,669 (three and nine months ended April 30, 2015: $3,167,896 and $9,711,933), respectively.

 

The following summary provides a discussion of the major expense categories, including analyses of the factors that caused significant variances compared to the same period last year:

 

·for the three and nine months ended April 30, 2016, salaries, management and consulting fees totaled $422,951 and $1,724,341, respectively, which decreased by $250,719 and $299,608, respectively, compared with $673,670 and $1,953,949 for the three and nine months ended April 30, 2015. This decrease was the result of pay reductions and other strategies implemented by the Company during the three months ended April, 2016;

 

·for the three and nine months ended April 30, 2016, office, investor relations, communications and travel expenses totaled $614,401 and $1,915,412, respectively, which decreased by $185,981 and $307,520, respectively, compared with $800,382 and $2,222,932 for the three and nine months ended April 30, 2015. This decrease reflects our continuing efforts to monitor and control these costs and reduce expenses wherever possible;

 

·for the three months ended April 30, 2016, professional fees totaled $169,253, which decreased by $206,712 compare with $375,965 for the three months ended April 30, 2015. For the nine months ended April 30, 2016, professional fees totaled $959,265, which have remained consistent compared with $906,508 for the nine months ended April 30, 2015. Professional fees are comprised primarily of legal services related to regulatory compliance and ongoing legal claims, in addition to audit and taxation services; and

 

 30 

 

  

·for the three and nine months ended April 30, 2016, stock-based compensation totaled $798,860 and $2,487,651, respectively, which decreased by $519,019 and $2,140,893, respectively, compared with $1,317,879 and $4,628,544 for the three and nine months ended April 30, 2015. Stock-based compensation includes the fair value of stock options granted to optionees and the fair value of shares of the Company’s common stock issued to consultants and employees. During the three and nine months ended April 30, 2016 and 2015, we continued to utilize equity-based payments for certain consulting services as part of our continuing efforts to reduce cash outlays. In September 2014, stock options to purchase 7,540,000 shares of the Company’s common stock were granted to certain directors, officers, employees and consultants of the Company. The fair value of these stock options has been amortized on an accelerated basis over the vesting period of the options, resulting in a higher stock-based compensation expense being recognized at the beginning of the vesting periods than at the end of the vesting periods.

 

Depreciation, Amortization and Accretion

 

During the three and nine months ended April 30, 2016, depreciation, amortization and accretion totaled $205,488 and $680,573, respectively, which decreased by $168,594 and $760,235, respectively, compared with $374,082 and $1,440,808 for the three and nine months ended April 30, 2015. This decrease was primarily the result of the discontinuation of depletion and/or depreciation of the Palangana Mine and Hobson Processing Facility due to further reduced operations, combined with the effects of certain property and equipment reaching full depletion and/or depreciation. Depreciation, amortization and accretion include depreciation and amortization of long-term assets acquired in the normal course of operations and accretion of asset retirement obligations.

 

Other Income and Expenses

 

Interest and Finance Costs

 

During the three and nine months ended April 30, 2016, interest and finance costs totaled $710,767 and $2,278,230, respectively, which have remained consistent compared to $764,761 and $2,270,104 for the three and nine months ended April 30, 2015.

 

For the three and nine months ended April 30, 2016, interest and finance costs were primarily comprised of, amortization of debt discount of $277,417 and $960,807, interest paid on long-term debt of $400,000 and $1,217,778 and amortization of annual surety bond premium of $28,687 and $85,447, respectively.

 

For the three and nine months ended April 30, 2015, interest and finance costs were primarily comprised of: amortization of debt discount of $336,262 and $994,669, interest paid on long-term debt of $395,555 and $1,213,333 and amortization of annual surety bond premium of $28,304 and $47,084, respectively.

 

Summary of Quarterly Results

 

   For the Quarters Ended 
   April 30, 2016   January 31, 2016   October 31, 2015   July 31, 2015 
                 
Sales  $-   $-   $-   $3,080,000 
Net loss   (3,679,055)   (4,801,505)   (5,072,034)   (5,412,432)
Total comprehensive loss   (3,678,919)   (4,801,724)   (5,072,233)   (5,412,059)
Basic and diluted loss per share   (0.03)   (0.05)   (0.05)   (0.06)
Total assets   59,558,492    49,982,462    53,130,380    57,900,257 

 

   For the Quarters Ended 
   April 30, 2015   January 31, 2015   October 31, 2014   July 31, 2014 
                 
Sales  $-   $-   $-   $- 
Net loss   (5,347,729)   (5,875,540)   (6,726,227)   (6,219,172)
Total comprehensive loss   (5,347,522)   (5,876,988)   (6,726,451)   (6,219,156)
Basic and diluted loss per share   (0.06)   (0.06)   (0.07)   (0.07)
Total assets   52,171,028    55,315,547    59,608,374    64,655,888 

 

 31 

 

  

Liquidity and Capital Resources

 

   April 30, 2016   July 31, 2015 
Cash and cash equivalents  $10,086,805   $10,092,408 
Current assets   11,115,132    10,807,618 
Current liabilities   2,113,915    4,560,698 
Working capital   9,001,217    6,246,920 

 

At April 30, 2016, we had a working capital of $9,001,217, an increase of $2,754,297 from our working capital of $6,246,920 at July 31, 2015. Current assets include $10,086,805 in cash and cash equivalents, the largest component of current assets. As a result, our working capital balance will fluctuate significantly as we utilize our cash and cash equivalents to fund our operations including exploration and pre-extraction activities.

 

As the Company does not expect to achieve and maintain profitability in the near term, the continuation of the Company as a going concern is dependent upon our ability to obtain adequate additional financing which we have successfully secured since inception, including those from asset divestitures. However, there is no assurance that we will be successful in securing any form of additional financing in the future when required and on terms favorable to the Company, therefore substantial doubt exists as to whether our cash resources and/or working capital will be sufficient to enable the Company to continue its operations for the next twelve months. The continued operations of the Company, including the recoverability of the carrying values of its assets, are dependent ultimately on the Company’s ability to achieve and maintain profitability and positive cash flow from its operations. Refer to Note 1: Nature of Operations and Going Concern of the Notes to the Consolidated Financial Statements for the three and nine months ended April 30, 2016.

 

During the three and nine months ended April 30, 2016, uranium extraction at PAA-1, 2 and 3 of the Palangana Mine continued to operate at a reduced pace since implementing our strategic plan in September 2013 to align our operations to a weak uranium market in a challenging post-Fukushima environment. This strategy has included the deferral of major pre-extraction expenditures and remaining in a state of operational readiness in anticipation of a recovery in uranium prices.

 

Although our planned principal operations commenced in Fiscal 2012 from which significant revenues from U3O8 sales have been realized historically, our revenues generated from U3O8 sales have been inconsistent and we have yet to achieve profitability. We have a history of operating losses resulting in an accumulated deficit balance since inception. During the nine months ended April 30, 2016, no revenue from U3O8 sales was realized and our net loss totaled $13,552,594, resulting in an accumulated deficit balance of $205,576,668 at April 30, 2016. During the nine months ended April 30, 2016 and 2015, net cash flows decreased by $5,603 and $7,416,445, respectively. Furthermore, we do not expect to achieve and maintain profitability or develop positive cash flow from our operations in the near term.

 

Historically, we have been reliant primarily on equity financings from the sale of our common stock and, during Fiscal 2014 and 2013, on debt financing in order to fund our operations. We have also relied to a limited extent, on cash flows generated from our mining activities during Fiscal 2015, 2013 and 2012, however, we have yet to achieve profitability or develop positive cash flow from operations, and we do not expect to achieve profitability or develop positive cash flow from operations in the near term. Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electrical generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us.

 

Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including continuing with our exploration and pre-extraction activities and acquiring additional uranium projects. In the absence of such additional financing, we would not be able to fund our operations, including continuing with our exploration and pre-extraction activities, which may result in delays, curtailment or abandonment of any one or all of our uranium projects.

 

 32 

 

  

Our anticipated operations including exploration and pre-extraction activities, will be dependent on and may change as a result of our financial position, the market price of uranium and other considerations, and such change may include accelerating the pace or broadening the scope of reducing our operations as originally announced on September 5, 2013. Our ability to secure adequate funding for these activities will be impacted by our operating performance, other uses of cash, the market price of uranium, the market price of our common stock and other factors which may be beyond our control. Specific examples of such factors include, but are not limited to:

 

·if the weakness in the market price of uranium experienced in Fiscal 2015 continues or weakens further during Fiscal 2016;

 

·if the weakness in the market price of our common stock experienced in Fiscal 2015 continues or weakens further during Fiscal 2016;

 

·if we default on making scheduled payments of fees and complying with the restrictive covenants as required under the Second Amended Credit Facility during Fiscal 2016, and it results in accelerated repayment of our indebtedness and/or enforcement by the Lenders against our key assets securing our indebtedness; and

 

·if another nuclear incident, such as the events that occurred at Fukushima in March 2011, were to occur during Fiscal 2016, continuing public support of nuclear power as a viable source of electrical generation may be adversely affected, which may result in significant and adverse effects on both the nuclear and uranium industries.

 

Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and to continue with exploration and pre-extraction activities and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities. The economic viability of our mining activities, including the expected duration and profitability of the Palangana Mine and of any future satellite ISR mines, such as the Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt, has many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct the mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in profitable mining activities.

 

Debt Financing

 

On February 9, 2016, the Company and its Lenders entered into the Second Amended and Restated Credit Agreement, which supersedes in their entirety, the prior Amended and Restated Credit Agreement dated and effective March 13, 2014 and the prior Credit Agreement dated and effective July 30, 2013. Pursuant to the Second Amended and Restated Credit Agreement, the Company and the Lenders agreed to extend the $20,000,000 senior secured credit facility by deferring required principal payments to February 1, 2019 and by extending the maturity date of the Second Amended Credit Facility to January 1, 2020. Under the terms of the Second Amended and Restated Credit Agreement, the Credit Facility Amount remains non-revolving with interest calculated at a rate of 8% per annum, compounded and payable on a monthly basis, with the underlying effective interest rate being 14.28%.

 

Refer to Note 8: Long-Term Debt of the Notes to the Consolidated Financial Statements for the three and nine months ended April 30, 2016.

 

 33 

 

  

Equity Financings

 

We filed a 2014 Shelf effective January 10, 2014 providing for the public offer and sale of certain securities of the Company from time to time, at its discretion, up to an aggregate offering of $100 million.

 

On March 10, 2016, the Company completed a registered offering of 12,364,704 units at a price of $0.85 per unit for gross proceeds of $10,510,000 pursuant to a prospectus supplement to the 2014 Shelf. Each unit was comprised of one share of common stock of the Company and one-half of one share purchase warrant, with each whole warrant being exercisable at a price of $1.20 to purchase one share to of common stock of the Company for a three year period from the date of issuance.

 

At April 30, 2016, a total of $35.1 million of the 2014 Shelf was utilized through the following registered offerings and sales of units, with a remaining available balance of $64.9 million under the 2014 Shelf:

 

·on June 25, 2015: $10.0 million in gross proceeds through an offering of units consisting of the Company’s shares and share purchase warrants and $6.7 million representing the aggregate exercise price of those share purchase warrants and agents’ share purchase warrants should they be exercised in full; and

 

·on March 10, 2016: $10.5 million in gross proceeds through an offering of units consisting of the Company’s shares and share purchase warrants and $7.9 million representing the aggregate exercise price of those share purchase warrants and agents’ share purchase warrants should they be exercised in full.

 

Operating Activities

 

Net cash used in operating activities during the nine months ended April 30, 2016 was $10,265,296 (nine months ended April 30, 2015: $11,761,904). Significant operating expenditures included mineral property expenditures, general and administrative expenses and interest payments.

 

Financing Activities

 

Net cash provided by financing activities during the nine months ended April 30, 2016 was $10,324,264, resulting from net cash of $10,099,149 from the share issuance for equity financing and net cash of $225,115 received from the exercise of stock options. Net cash provided by financing activities during the nine months ended April 30, 2015 was $454,984 resulting from net cash of $435,590 received from the share issuance for an equity financing and the exercise of stock options, and an increase of $19,394 in amounts due to related parties.

 

Investing Activities

 

Net cash used in investing activities during the nine months ended April 30, 2016 was $64,571, resulting primarily from net cash of $ 46,084 used in asset acquisition and purchase of property, plant and equipment of $19,304. Net cash provided by investing activities during the nine months ended April 30, 2015 was $3,890,475, resulting primarily from gross proceeds of $5,663,158 received from the release of reclamation deposits, offset by the payment of collateral for the surety bonds of $1,690,208, acquisition of mineral rights and properties of $73,624 and purchase of property, plant and equipment of $10,905.

 

Stock Options and Warrants

 

At April 30, 2016, the Company had stock options outstanding representing 11,045,358 common shares at a weighted-average exercise price of $1.41 per share and share purchase warrants outstanding representing 13,953,872 common shares at a weighted-average exercise price of $1.61 per share. At April 30, 2016, outstanding stock options and warrants represented a total 24,999,230 shares issuable for gross proceeds of approximately $41,701,000 should these stock options and warrants be exercised in full. At April 30, 2016, outstanding in-the-money stock options and warrants represented a total 1,219,634 common shares exercisable for gross proceeds of approximately $549,000 should these in-the-money stock options and warrants be exercised in full. The exercise of these stock options and warrants is at the discretion of the respective holders and, accordingly, there is no assurance that any of these stock options or warrants will be exercised in the future.

 

 34 

 

  

Transactions with a Related Party

 

During the three and nine months ended April 30, 2016, the Company incurred $30,134 and $128,727 (three and nine months ended April 30, 2015: $45,443 and $118,101), respectively, in general and administrative costs paid to a company controlled by a direct family member of a director and officer of the Company.

 

During the three months ended April 30, 2016, the Company issued 117,998 restricted common shares with fair value of $109,738 as settlement of amounts owed to this company totaling $98,371. As a result, a loss on settlement of current liabilities of $11,367 was recognized and included in the consolidated statements of operations. During the nine months ended April 30, 2015, the Company issued 15,000 restricted shares of common stock with a fair value of $18,150 to this company for consulting services included in general and administrative costs.

 

At April 30, 2016, amounts owed to related parties totaled $897 (July 31, 2015: $14,660). These amounts are unsecured, non-interest bearing and due on demand.

 

Material Commitments

 

Long-Term Debt Obligations

 

At April 30, 2016, we have made all scheduled payments and complied with all of the covenants under the Second Amended and Restated Credit Agreement dated and effective February 9, 2016, and we expect to continue complying with all scheduled payments and covenants during our fiscal year ending July 31, 2016.

 

Off-Balance Sheet Arrangements

 

We do not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.

 

Critical Accounting Policies

 

For a complete summary of all of our significant accounting policies, refer to Note 2: Summary of Significant Accounting Policies of the Notes to the Consolidated Financial Statements as presented under Item 8. Financial Statements and Supplementary Data in our Form 10-K Annual Report for the fiscal year ended July 31, 2015.

 

Refer to “Critical Accounting Policies” under Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations in our Form 10-K Annual Report for the fiscal year ended July 31, 2015.

 

 35 

 

  

Item 3.      Quantitative and Qualitative Disclosures About Market Risk

 

Refer to Item 7A. Quantitative and Qualitative Disclosures About Market Risk in our Form 10-K Annual Report for the fiscal year ended July 31, 2015.

 

Item 4.      Controls and Procedures

 

Evaluation of Disclosure Controls and Procedures

 

Our management, with the participation of our Principal Executive Officer and Principal Financial Officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of the end of the period covered by this Quarterly Report. Based on such evaluation, our Principal Executive Officer and Principal Financial Officer have concluded that, as of the end of the period covered by this Quarterly Report, our disclosure controls and procedures were effective.

 

It should be noted that any system of controls is based in part upon certain assumptions designed to obtain reasonable (and not absolute) assurance as to its effectiveness, and there can be no assurance that any design will succeed in achieving its stated goals.

 

Changes in Internal Controls

 

There have been no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during our fiscal quarter ended April 30, 2016, that have materially affected, or are reasonably likely to materially affect our internal control over financial reporting.

 

 36 

 

 

PART II – OTHER INFORMATION

 

Item 1.      Legal Proceedings

 

As of the date of this Quarterly Report, other than as disclosed below, there are no material pending legal proceedings, other than ordinary routine litigation incidental to our business, to which the Company or any of its subsidiaries is a party or of which any of their property is subject, and no director, officer, affiliate or record or beneficial owner of more than 5% of our common stock, or any associate or any such director, officer, affiliate or security holder, is (i) a party adverse to us or any of our subsidiaries in any legal proceeding or (ii) has an adverse interest to us or any of our subsidiaries in any legal proceeding. Other than as disclosed below, management is not aware of any other material legal proceedings pending or that have been threatened against us or our properties.

 

On or about March 9, 2011, the Texas Commission on Environmental Quality (the “TCEQ”) granted the Company’s applications for a Class III Injection Well Permit, Production Area Authorization and Aquifer Exemption for its Goliad Project.  On or about December 4, 2012, the U.S. Environmental Protection Agency (the “EPA”) concurred with the TCEQ issuance of the Aquifer Exemption permit (the “AE”).  With the receipt of this concurrence, the final authorization required for uranium extraction, the Goliad Project achieved fully-permitted status.  On or about May 24, 2011, a group of petitioners, inclusive of Goliad County, appealed the TCEQ action to the 250th District Court in Travis County, Texas.  A motion filed by the Company to intervene in this matter was granted. The petitioners’ appeal lay dormant until on or about June 14, 2013, when the petitioners filed their initial brief in support of their position.  On or about January 18, 2013, a different group of petitioners, exclusive of Goliad County, filed a petition for review with the Court of Appeals for the Fifth Circuit in the United States (the “Fifth Circuit”) to appeal the EPA’s decision.  On or about March 5, 2013, a motion filed by the Company to intervene in this matter was granted.  The parties attempted to resolve both appeals, to facilitate discussions and avoid further legal costs. The parties jointly agreed, through mediation initially conducted through the Fifth Circuit on or about August 8, 2013, to abate the proceedings in the State District Court. On or about August 21, 2013, the State District Court agreed to abate the proceedings.  The EPA subsequently filed a motion to remand without vacatur with the Fifth Circuit wherein the EPA's stated purpose was to elicit additional public input and further explain its rationale for the approval.  In requesting the remand without vacatur, which would allow the AE to remain in place during the review period, the EPA denied the existence of legal error and stated that it was unaware of any additional information that would merit reversal of the AE.  The Company and the TCEQ filed a request to the Fifth Circuit for the motion to remand without vacatur, and if granted, to be limited to a 60-day review period.  On December 9, 2013, by way of a procedural order from a three-judge panel of the Fifth Circuit, the Court granted the remand without vacatur and initially limited the review period to 60 days. In March of 2014, at the EPA’s request, the Fifth Circuit extended the EPA’s time period for review and additionally, during that same period, the Company conducted a joint groundwater survey of the site, the result of which reaffirmed the Company’s previously filed groundwater direction studies. On or about June 17, 2014, the EPA reaffirmed its earlier decision to uphold the granting of the Company’s existing AE, with the exception of a northwestern portion containing less than 10% of the uranium resource which was withdrawn, but not denied, from the AE area until additional information is provided in the normal course of mine development. On or about September 9, 2014, the petitioners filed a status report with the State District Court which included a request to remove the stay agreed to in August 2013 and to set a briefing schedule (the “Status Report”). In that Status Report, the petitioners also stated that they had decided not to pursue their appeal at the Fifth Circuit. The Company continues to believe that the pending appeal is without merit and is continuing as planned towards uranium extraction at its fully-permitted Goliad Project.

 

On or about April 3, 2012, the Company received notification of a lawsuit filed in the State of Arizona, in the Superior Court for the County of Yavapai, by certain petitioners (the “Plaintiffs”) against a group of defendants, including the Company and former management and board members of Concentric Energy Corp. (“Concentric”). The lawsuit asserts certain claims relating to the Plaintiffs’ equity investments in Concentric, including allegations that the former management and board members of Concentric engaged in various wrongful acts prior to and/or in conjunction with the merger of Concentric. The lawsuit originally further alleged that the Company was contractually liable for liquidated damages arising from a pre-merger transaction which the Company previously acknowledged and recorded as an accrued liability, and which portion of the lawsuit was settled in full by a cash payment of $149,194 to the Plaintiffs and subsequently dismissed. The court dismissed several other claims set forth in the Plaintiffs’ initial complaint, but granted the Plaintiffs leave to file an amended complaint.  The court denied a subsequent motion to dismiss the amended complaint, finding that the pleading met the minimal pleading requirements under the applicable procedural rules.  In October 2013, the Company filed a formal response denying liability for any of the Plaintiffs’ remaining claims. The court set the case for a four-week jury trial that was to take place in Yavapai County, Arizona, in April 2016.  In November 2015, after the completion of discovery, the Company and the remaining defendants filed motions for summary judgment, seeking to dismiss all of the Plaintiffs’ remaining claims.  While those motions were pending, the parties reached a settlement agreement with respect to all claims asserted by the Plaintiffs in that lawsuit.  A formal settlement and release agreement was subsequently executed, pursuant to which all of the Plaintiffs’ claims in the Arizona lawsuit were dismissed with prejudice.  Pursuant to the terms of the settlement agreement, the Defendants collectively paid $500,000 to the Plaintiffs, of which $50,000 will be paid by the Company.

 

 37 

 

 

On June 1, 2015, the Company received notice that Westminster Securities Corporation filed a suit in the United States District Court for the Southern District of New York, alleging a breach of contract relating to certain four-year warrants issued by Concentric in December 2008.  Although the Concentric warrants expired by their terms on December 31, 2012, Westminster bases its claim upon transactions allegedly occurring prior to UEC’s merger with Concentric.  The Company believes that this claim lacks merit and intends to vigorously defend the same.

 

On or about June 29, 2015, Heather M. Stephens filed a class action complaint against the Company and two of its executive officers in the United States District Court, Southern District of Texas, with an amended class action complaint filed on November 16, 2015, (the "Securities Case") seeking unspecified damages and alleging the defendants violated Section 17(b) of the Securities Act of 1933 and Sections 10(b) and 20(a) of the Securities Exchange Act of 1934. The Company has filed a motion to dismiss.

 

On or about September 10, 2015, John Price filed a stockholder derivative complaint on behalf of the Company against the Company's Board of Directors, executive management and three of its vice presidents in the United States District Court, Southern District of Texas, with an amended stockholder derivative complaint filed on December 4, 2015, (the “Federal Derivative Case”) seeking unspecified damages on behalf of the Company against the defendants for allegedly breaching their fiduciary duties to the Company with respect to the allegations in the Securities Case. The Company has filed a motion to dismiss.

 

On or about October 2, 2015, Marnie W. McMahon filed a stockholder derivative complaint on behalf of the Company against the Company's Board of Directors, executive management and three of its vice presidents in the District Court of Nevada (the “Nevada Derivative Case”) (collectively with the Federal Derivative Case, the “Derivative Cases”) seeking unspecified damages on behalf of the Company against the defendants for allegedly breaching their fiduciary duties to the Company with respect to the allegations in the Securities Case. On January 21, 2016, the court granted the Company’s motion to stay the Nevada Derivative Case pending the outcome of the Federal Derivative Case.

 

The Company believes that the Securities Case and the Derivative Cases are without merit and intends to defend vigorously against them.

 

The Company’s Board of Directors received a shareholder demand letter dated September 10, 2015 relating to the allegations in the Securities Case (the “Shareholder Demand”). The letter demands that the Board of Directors initiate an action against the Company’s Board of Directors and two of its executive officers to recover damages allegedly caused to the Company. The Board of Directors is reviewing the Shareholder Demand to determine the appropriate course of action.

 

Item 1A.          Risk Factors

 

In addition to the information contained in our Form 10-K Annual Report for the fiscal year ended July 31, 2015, and this Form 10-Q Quarterly Report, we have identified the following material risks and uncertainties which reflect our outlook and conditions known to us as of the date of this Quarterly Report. These material risks and uncertainties should be carefully reviewed by our stockholders and any potential investors in evaluating the Company, our business and the market value of our common stock. Furthermore, any one of these material risks and uncertainties has the potential to cause actual results, performance, achievements or events to be materially different from any future results, performance, achievements or events implied, suggested or expressed by any forward-looking statements made by us or by persons acting on our behalf. Refer to “Cautionary Note Regarding Forward-Looking Statements” as disclosed in our Form 10-K Annual Report for the fiscal year ended July 31, 2015.

 

 38 

 

 

There is no assurance that we will be successful in preventing the material adverse effects that any one or more of the following material risks and uncertainties may cause on our business, prospects, financial condition and operating results, which may result in a significant decrease in the market price of our common stock. Furthermore, there is no assurance that these material risks and uncertainties represent a complete list of the material risks and uncertainties facing us. There may be additional risks and uncertainties of a material nature that, as of the date of this Quarterly Report, we are unaware of or that we consider immaterial that may become material in the future, any one or more of which may result in a material adverse effect on us. You could lose all or a significant portion of your investment due to any one of these material risks and uncertainties.

 

Risks Related to Our Company and Business

 

Evaluating our future performance may be difficult since we have a limited financial and operating history, with significant negative cash flow and accumulated deficit to date. Furthermore, there is no assurance that we will be successful in securing any form of additional financing in the future, therefore substantial doubt exists as to whether our cash resources and/or working capital will be sufficient to enable the Company to continue its operations over the next twelve months. Our long-term success will depend ultimately on our ability to achieve and maintain profitability and to develop positive cash flow from our mining activities.

 

As more fully described under Item 1. Business, in our Form 10-K Annual Report for the fiscal year ended July 31, 2015, Uranium Energy Corp. was incorporated under the laws of the State of Nevada on May 16, 2003 and since 2004, we have been engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on projects located in the United States and Paraguay. In November 2010, we commenced uranium extraction for the first time at the Palangana Mine utilizing ISR and processed those materials at the Hobson Processing Facility into drums of U3O8, our only sales product and source of revenue. We also hold uranium projects in various stages of exploration and pre-extraction in the States of Arizona, Colorado, New Mexico, Texas and Wyoming and the Republic of Paraguay.

 

As more fully described under “Liquidity and Capital Resources” of Item 2. Management’s Discussion and Analysis of Financial Condition and Result of Operations, we have a history of significant negative cash flow and net losses, with an accumulated deficit balance of $205.6 million at April 30, 2016. Historically, we have been reliant primarily on equity financings from the sale of our common stock and, for Fiscal 2014 and 2013, on debt financing in order to fund our operations. Although we generated revenues from sales of U3O8 during Fiscal 2015, 2013 and 2012 of $3.1 million, $9.0 million and $13.8 million, respectively, with no revenues from sales of U3O8 generated during the nine months ended April 30, 2016, Fiscal 2014 or for any periods prior to Fiscal 2012, we have yet to achieve profitability or develop positive cash flow from our operations, and we do not expect to achieve profitability or develop positive cash flow from operations in the near term. As a result of our limited financial and operating history, including our significant negative cash flow and net losses to date, it may be difficult to evaluate our future performance.

 

At April 30, 2016, we had a working capital of $9.0 million including cash and cash equivalents of $10.1 million. As the Company does not expect to achieve and maintain profitability in the near term, the continuation of the Company as a going concern is dependent upon our ability to obtain adequate additional financing which we have successfully secured since inception, including those from asset divestitures. However, there is no assurance that we will be successful in securing any form of additional financing in the future, therefore, substantial doubt exists as to whether our cash resources and/or working capital will be sufficient to enable the Company to continue its operations over the next twelve months.

 

Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required, will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electrical generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project.

 

 39 

 

 

Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and continue with exploration and pre-extraction activities and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities. The economic viability of our mining activities, including the expected duration and profitability of the Palangana Mine and of any future satellite ISR mines, such as the Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt, has many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct the mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vi) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in achieving and maintaining profitability and developing positive cash flow.

 

Our operations are capital intensive, and we will require significant additional financing to acquire additional uranium projects and continue with our exploration and pre-extraction activities on our existing uranium projects.

 

Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional uranium projects and continuing with our exploration and pre-extraction activities which include assaying, drilling, geological and geochemical analysis and mine construction costs. In the absence of such additional financing we would not be able to fund our operations or continue with our exploration and pre-extraction activities, which may result in delays, curtailment or abandonment of any one or all of our uranium projects.

 

If we are unable to service our indebtedness, we may be faced with accelerated repayments or lose the assets securing our indebtedness. Furthermore, restrictive covenants governing our indebtedness may restrict our ability to pursue our business strategies.

 

Effective on February 9, 2016, we entered into a Second Amended and Restated Credit Agreement with our Lenders under which we had previously drawn down the maximum $20 million in principal as of April 30, 2016. The Second Amended Credit Facility requires monthly interest payments calculated at 8% per annum and other periodic fees, and principal repayments of $1.67 million per month over a twelve-month period commencing on February 1, 2019. Our ability to continue making these scheduled payments will be dependent on and may change as a result of our financial condition and operating results. Failure to make any one of these scheduled payments will put us in default with the Second Amended Credit Facility which, if not addressed or waived, could require accelerated repayment of our indebtedness and/or enforcement by the Lenders against the Company’s assets. Enforcement against our assets would have a material adverse effect on our financial condition and operating results.

 

Furthermore, the Second Amended Credit Facility includes restrictive covenants that, among other things, limit our ability to sell our assets or to incur additional indebtedness other than permitted indebtedness, which may restrict our ability to pursue certain business strategies from time to time. If we do not comply with these restrictive covenants, we could be in default which, if not addressed or waived, could require accelerated repayment of our indebtedness and/or enforcement by the Lenders against our assets.

 

Our uranium extraction and sales history is limited, with our uranium extraction to date originating from a single uranium mine. Our ability to continue generating revenue is subject to a number of factors, any one or more of which may adversely affect our financial condition and operating results.

 

We have a limited history of uranium extraction and generating revenue. In November 2010, we commenced uranium extraction at a single uranium mine, the Palangana Mine, which has been our sole source for the U3O8 sold to generate our revenues from sales of U3O8 during Fiscal 2015, 2013 and 2012 of $3.1 million, $9.0 million and $13.8 million, respectively, with no revenues from sales of U3O8 generated during Fiscal 2014 or for any periods prior to Fiscal 2012.

 

During the nine months ended April 30, 2016, uranium extraction at PAA-1, 2 and 3 continued to operate at a reduced pace since implementing our strategic plan in September 2013 to align our operations to a weak uranium commodity market in a challenging post-Fukushima environment. This strategy has included the deferral of major pre-extraction expenditures and remaining in a state of operational readiness in anticipation of a recovery in uranium prices.  Our ability to continue generating revenue from the Palangana Mine is subject to a number of factors which include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct the mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Furthermore, continued mining activities at the Palangana Mine will eventually deplete the Palangana Mine or cause such activities to become uneconomical, and if we are unable to directly acquire or develop existing uranium projects, such as the Burke Hollow and Goliad Projects, into additional uranium mines from which we can commence uranium extraction, it will negatively impact our ability to generate revenues. Any one or more of these occurrences may adversely affect our financial condition and operating results.

 

 40 

 

 

Uranium exploration and pre-extraction programs and mining activities are inherently subject to numerous significant risks and uncertainties, and actual results may differ significantly from expectations or anticipated amounts. Furthermore, exploration programs conducted on our uranium projects may not result in the establishment of ore bodies that contain commercially recoverable uranium.

 

Uranium exploration and pre-extraction programs and mining activities are inherently subject to numerous significant risks and uncertainties, many beyond our control, including, but not limited to: (i) unanticipated ground and water conditions and adverse claims to water rights; (ii) unusual or unexpected geological formations; (iii) metallurgical and other processing problems; (iv) the occurrence of unusual weather or operating conditions and other force majeure events; (v) lower than expected ore grades; (vi) industrial accidents; (vii) delays in the receipt of or failure to receive necessary government permits; (viii) delays in transportation; (ix) availability of contractors and labor; (x) government permit restrictions and regulation restrictions; (xi) unavailability of materials and equipment; and (xii) the failure of equipment or processes to operate in accordance with specifications or expectations. These risks and uncertainties could result in: (i) delays, reductions or stoppages in our mining activities; (ii) increased capital and/or extraction costs; (iii) damage to, or destruction of, our mineral projects, extraction facilities or other properties; (iv) personal injuries; (v) environmental damage; (vi) monetary losses; and (vii) legal claims.

 

Success in uranium exploration is dependent on many factors, including, without limitation, the experience and capabilities of a company’s management, the availability of geological expertise and the availability of sufficient funds to conduct the exploration program. Even if an exploration program is successful and commercially recoverable uranium is established, it may take a number of years from the initial phases of drilling and identification of the mineralization until extraction is possible, during which time the economic feasibility of extraction may change such that the uranium ceases to be economically recoverable. Uranium exploration is frequently non-productive due, for example, to poor exploration results or the inability to establish ore bodies that contain commercially recoverable uranium, in which case the uranium project may be abandoned and written-off. Furthermore, we will not be able to benefit from our exploration efforts and recover the expenditures that we incur on our exploration programs if we do not establish ore bodies that contain commercially recoverable uranium and develop these uranium projects into profitable mining activities, and there is no assurance that we will be successful in doing so for any of our uranium projects.

 

Whether an ore body contains commercially recoverable uranium depends on many factors including, without limitation: (i) the particular attributes, including material changes to those attributes, of the ore body such as size, grade, recovery rates and proximity to infrastructure; (ii) the market price of uranium, which may be volatile; and (iii) government regulations and regulatory requirements including, without limitation, those relating to environmental protection, permitting and land use, taxes, land tenure and transportation.

 

We have not established proven or probable reserves through the completion of a “final” or “bankable” feasibility study for any of our uranium projects, including the Palangana Mine. Furthermore, we have no plans to establish proven or probable reserves for any of our uranium projects for which we plan on utilizing ISR mining, such as the Palangana Mine. Since we commenced extraction of mineralized materials from the Palangana Mine without having established proven or probable reserves, it may result in our mining activities at the Palangana Mine, and at any future uranium projects for which proven or probable reserves are not established, being inherently riskier than other mining activities for which proven or probable reserves have been established.

 

We have established the existence of mineralized materials for certain uranium projects, including the Palangana Mine. We have not established proven or probable reserves, as defined by the SEC under Industry Guide 7, through the completion of a “final” or “bankable” feasibility study for any of our uranium projects, including the Palangana Mine. Furthermore, we have no plans to establish proven or probable reserves for any of our uranium projects for which we plan on utilizing ISR mining, such as the Palangana Mine. Since we commenced uranium extraction at the Palangana Mine without having established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be economically extracted as originally planned and anticipated. Any mineralized materials established or extracted from the Palangana Mine should not in any way be associated with having established or produced from proven or probable reserves.

 

 41 

 

 

Since we are in the Exploration Stage, pre-production expenditures including those related to pre-extraction activities are expensed as incurred, the effects of which may result in our consolidated financial statements not being directly comparable to the financial statements of companies in the Production Stage.

 

Despite the fact that we commenced uranium extraction at the Palangana Mine in November 2010, we remain in the Exploration Stage as defined under Industry Guide 7, and will continue to remain in the Exploration Stage until such time proven or probable reserves have been established, which may never occur. We prepare our consolidated financial statements in accordance with United States generally accepted accounting principles (“U.S. GAAP”) under which acquisition costs of mineral rights are initially capitalized as incurred while pre-production expenditures are expensed as incurred until such time we exit the Exploration Stage.  Expenditures relating to exploration activities are expensed as incurred and expenditures relating to pre-extraction activities are expensed as incurred until such time proven or probable reserves are established for that uranium project, after which subsequent expenditures relating to mine development activities for that particular project are capitalized as incurred.

 

We have neither established nor have any plans to establish proven or probable reserves for our uranium projects for which we plan on utilizing ISR mining, such as the Palangana Mine. Companies in the Production Stage as defined by the SEC under Industry Guide 7, having established proven and probable reserves and exited the Exploration Stage, typically capitalize expenditures relating to ongoing development activities, with corresponding depletion calculated over proven and probable reserves using the units-of-production method and allocated to future reporting periods to inventory and, as that inventory is sold, to cost of goods sold. As we are in the Exploration Stage, it has resulted in us reporting larger losses than if we had been in the Production Stage due to the expensing, instead of capitalization, of expenditures relating to ongoing mill and mine pre-extraction activities. Additionally, there would be no corresponding amortization allocated to our future reporting periods since those costs would have been expensed previously, resulting in both lower inventory costs and cost of goods sold and results of operations with higher gross profits and lower losses than if we had been in the Production Stage. Any capitalized costs, such as acquisition costs of mineral rights, are depleted over the estimated extraction life using the straight-line method. As a result, our consolidated financial statements may not be directly comparable to the financial statements of companies in the Production Stage.

 

Estimated costs of future reclamation obligations may be significantly exceeded by actual costs incurred in the future. Furthermore, only a portion of the financial assurance required for the future reclamation obligations has been funded.

 

We are responsible for certain remediation and decommissioning activities in the future primarily for the Hobson Processing Facility and the Palangana Mine, and have recorded a liability of $3.9 million on our balance sheet at April 30, 2016, to recognize the present value of the estimated costs of such reclamation obligations.  Should the actual costs to fulfill these future reclamation obligations materially exceed these estimated costs, it may have an adverse effect on our financial condition and operating results, including not having the financial resources required to fulfill such obligations when required to do so.

 

During Fiscal 2015, we secured $5.6 million of surety bonds as an alternate source of financial assurance for the estimated costs of the reclamation obligations of the Hobson Processing Facility and the Palangana Mine, of which we have $1.7 million funded and held as restricted cash for collateral purposes as required by the surety. We may be required at any time to fund the remaining $3.9 million or any portion thereof for a number of reasons including, but not limited to, the following: (i) the terms of the surety bonds are amended, such as an increase in collateral requirements; (ii) we are in default with the terms of the surety bonds; (iii) the surety bonds are no longer acceptable as an alternate source of financial assurance by the regulatory authorities; or (iv) the surety encounters financial difficulties. Should any one or more of these events occur in the future, we may not have the financial resources to fund the remaining amount or any portion thereof when required to do so.

 

 42 

 

 

We do not insure against all of the risks we face in our operations.

 

In general, where coverage is available and not prohibitively expensive relative to the perceived risk, we will maintain insurance against such risk, subject to exclusions and limitations. We currently maintain insurance against certain risks including securities and general commercial liability claims and certain physical assets used in our operations, subject to exclusions and limitations, however, we do not maintain insurance to cover all of the potential risks and hazards associated with our operations.  We may be subject to liability for environmental, pollution or other hazards associated with our exploration, pre-extraction and extraction activities, which we may not be insured against, which may exceed the limits of our insurance coverage or which we may elect not to insure against because of high premiums or other reasons. Furthermore, we cannot provide assurance that any insurance coverage we currently have will continue to be available at reasonable premiums or that such insurance will adequately cover any resulting liability.

 

Acquisitions that we may make from time to time could have an adverse impact on us.

 

From time to time, we examine opportunities to acquire additional mining assets and businesses. Any acquisition that we may choose to complete may be of a significant size, may change the scale of our business and operations, and may expose us to new geographic, political, operating, financial and geological risks. Our success in our acquisition activities depends on our ability to identify suitable acquisition candidates, negotiate acceptable terms for any such acquisition, and integrate the acquired operations successfully with those of our Company. Any acquisitions would be accompanied by risks which could have a material adverse effect on our business. For example: (i) there may be a significant change in commodity prices after we have committed to complete the transaction and established the purchase price or exchange ratio; (ii) a material ore body may prove to be below expectations; (iii) we may have difficulty integrating and assimilating the operations and personnel of any acquired companies, realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization; (iv) the integration of the acquired business or assets may disrupt our ongoing business and our relationships with employees, customers, suppliers and contractors; and (v) the acquired business or assets may have unknown liabilities which may be significant. In the event that we choose to raise debt capital to finance any such acquisition, our leverage will be increased. If we choose to use equity as consideration for such acquisition, existing shareholders may suffer dilution. Alternatively, we may choose to finance any such acquisition with our existing resources. There can be no assurance that we would be successful in overcoming these risks or any other problems encountered in connection with such acquisitions.

 

The uranium industry is subject to numerous stringent laws, regulations and standards, including environmental protection laws and regulations. If any changes occur that would make these laws, regulations and standards more stringent, it may require capital outlays in excess of those anticipated or cause substantial delays, which would have a material adverse effect on our operations.

 

Uranium exploration and pre-extraction programs and mining activities are subject to numerous stringent laws, regulations and standards at the federal, state, and local levels governing permitting, pre-extraction, extraction, exports, taxes, labor standards, occupational health, waste disposal, protection and reclamation of the environment, protection of endangered and protected species, mine safety, hazardous substances and other matters. Our compliance with these requirements requires significant financial and personnel resources.

 

The laws, regulations, policies or current administrative practices of any government body, organization or regulatory agency in the United States or any other applicable jurisdiction, may change or be applied or interpreted in a manner which may also have a material adverse effect on our operations. The actions, policies or regulations, or changes thereto, of any government body or regulatory agency or special interest group, may also have a material adverse effect on our operations.

 

Uranium exploration and pre-extraction programs and mining activities are subject to stringent environmental protection laws and regulations at the federal, state, and local levels. These laws and regulations include permitting and reclamation requirements, regulate emissions, water storage and discharges and disposal of hazardous wastes. Uranium mining activities are also subject to laws and regulations which seek to maintain health and safety standards by regulating the design and use of mining methods. Various permits from governmental and regulatory bodies are required for mining to commence or continue, and no assurance can be provided that required permits will be received in a timely manner.

 

Our compliance costs including the posting of surety bonds associated with environmental protection laws and regulations and health and safety standards have been significant to date, and are expected to increase in scale and scope as we expand our operations in the future. Furthermore, environmental protection laws and regulations may become more stringent in the future, and compliance with such changes may require capital outlays in excess of those anticipated or cause substantial delays, which would have a material adverse effect on our operations.

 

 43 

 

 

To the best of our knowledge, our operations are in compliance, in all material respects, with all applicable laws, regulations and standards. If we become subject to liability for any violations, we may not be able or may elect not to insure against such risk due to high insurance premiums or other reasons. Where coverage is available and not prohibitively expensive relative to the perceived risk, we will maintain insurance against such risk, subject to exclusions and limitations. However, we cannot provide any assurance that such insurance will continue to be available at reasonable premiums or that such insurance will be adequate to cover any resulting liability.

 

We may not be able to obtain, maintain or amend rights, authorizations, licenses, permits or consents required for our operations.

 

Our exploration and mining activities are dependent upon the grant of appropriate rights, authorizations, licences, permits and consents, as well as continuation and amendment of these rights, authorizations, licences, permits and consents already granted, which may be granted for a defined period of time, or may not be granted or may be withdrawn or made subject to limitations. There can be no assurance that all necessary rights, authorizations, licences, permits and consents will be granted to us, or that authorizations, licences, permits and consents already granted will not be withdrawn or made subject to limitations.

 

Major nuclear incidents may have adverse effects on the nuclear and uranium industries.

 

The nuclear incident that occurred in Japan in March 2011 had significant and adverse effects on both the nuclear and uranium industries. If another nuclear incident were to occur, it may have further adverse effects for both industries. Public opinion of nuclear power as a source of electrical generation may be adversely affected, which may cause governments of certain countries to further increase regulation for the nuclear industry, reduce or abandon current reliance on nuclear power or reduce or abandon existing plans for nuclear power expansion. Any one of these occurrences has the potential to reduce current and/or future demand for nuclear power, resulting in lower demand for uranium and lower market prices for uranium, adversely affecting the Company’s operations and prospects. Furthermore, the growth of the nuclear and uranium industries is dependent on continuing and growing public support of nuclear power as a viable source of electrical generation.

 

The marketability of uranium concentrates will be affected by numerous factors beyond our control which may result in our inability to receive an adequate return on our invested capital.

 

The marketability of uranium concentrates extracted by us will be affected by numerous factors beyond our control. These factors include macroeconomic factors, fluctuations in the market price of uranium, governmental regulations, land tenure and use, regulations concerning the importing and exporting of uranium and environmental protection regulations. The future effects of these factors cannot be accurately predicted, but any one or a combination of these factors may result in our inability to receive an adequate return on our invested capital.

 

The uranium industry is highly competitive and we may not be successful in acquiring additional projects.

 

The uranium industry is highly competitive, and our competition includes larger, more established companies with longer operating histories that not only explore for and produce uranium, but also market uranium and other products on a regional, national or worldwide basis. Due to their greater financial and technical resources, we may not be able to acquire additional uranium projects in a competitive bidding process involving such companies. Additionally, these larger companies have greater resources to continue with their operations during periods of depressed market conditions.

 

We hold mineral rights in foreign jurisdictions which could be subject to additional risks due to political, taxation, economic and cultural factors.

 

We hold certain mineral rights located in Paraguay through the acquisition of Piedra Rica Mining S.A. and Transandes Paraguay S.A., both companies incorporated in Paraguay. Operations in foreign jurisdictions outside of the United States and Canada, especially in developing countries, may be subject to additional risks as they may have different political, regulatory, taxation, economic and cultural environments that may adversely affect the value or continued viability of our rights. These additional risks include, but are not limited to: (i) changes in governments or senior government officials; (ii) changes to existing laws or policies on foreign investments, environmental protection, mining and ownership of mineral interests; (iii) renegotiation, cancellation, expropriation and nationalization of existing permits or contracts; (iv) foreign currency controls and fluctuations; and (v) civil disturbances, terrorism and war.

 

 44 

 

 

In the event of a dispute arising at our foreign operations in Paraguay, we may be subject to the exclusive jurisdiction of foreign courts or may not be successful in subjecting foreign persons to the jurisdiction of the courts in the United States or Canada. We may also be hindered or prevented from enforcing our rights with respect to a government entity or instrumentality because of the doctrine of sovereign immunity. Any adverse or arbitrary decision of a foreign court may have a material and adverse impact on our business, prospects, financial condition and results of operations.

 

The title to our mineral property interests may be challenged.

 

Although we have taken reasonable measures to ensure proper title to our interests in mineral properties and other assets, there is no guarantee that the title to any of such interests will not be challenged. No assurance can be given that we will be able to secure the grant or the renewal of existing mineral rights and tenures on terms satisfactory to us, or that governments in the jurisdictions in which we operate will not revoke or significantly alter such rights or tenures or that such rights or tenures will not be challenged or impugned by third parties, including local governments, aboriginal peoples or other claimants. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. A successful challenge to the precise area and location of our claims could result in us being unable to operate on our properties as permitted or being unable to enforce our rights with respect to our properties.

 

Due to the nature of our business, we may be subject to legal proceedings which may divert management’s time and attention from our business and result in substantial damage awards.

 

Due to the nature of our business, we may be subject to numerous regulatory investigations, securities claims, civil claims, lawsuits and other proceedings in the ordinary course of our business including those described under Item 1. Legal Proceedings. The outcome of these lawsuits is uncertain and subject to inherent uncertainties, and the actual costs to be incurred will depend upon many unknown factors. We may be forced to expend significant resources in the defense of these suits, and we may not prevail. Defending against these and other lawsuits in the future may not only require us to incur significant legal fees and expenses, but may become time-consuming for us and detract from our ability to fully focus our internal resources on our business activities. The results of any legal proceeding cannot be predicted with certainty due to the uncertainty inherent in litigation, the difficulty of predicting decisions of regulators, judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business, financial position or operating results.

 

We depend on certain key personnel, and our success will depend on our continued ability to retain and attract such qualified personnel.

 

Our success is dependent on the efforts, abilities and continued service of certain senior officers and key employees and consultants. A number of our key employees and consultants have significant experience in the uranium industry. A loss of service from any one of these individuals may adversely affect our operations, and we may have difficulty or may not be able to locate and hire a suitable replacement.

 

Certain directors and officers may be subject to conflicts of interest.

 

The majority of our directors and officers are involved in other business ventures including similar capacities with other private or publicly-traded companies. Such individuals may have significant responsibilities to these other business ventures, including consulting relationships, which may require significant amounts of their available time. Conflicts of interest may include decisions on how much time to devote to our business affairs and what business opportunities should be presented to us. Our Code of Business Conduct for Directors, Officers and Employees provides for guidance on conflicts of interest.

 

 45 

 

 

The laws of the State of Nevada and our Articles of Incorporation may protect our directors and officers from certain types of lawsuits.

 

The laws of the State of Nevada provide that our directors and officers will not be liable to the Company or its stockholders for monetary damages for all but certain types of conduct as directors and officers of the Company. Our Bylaws provide for broad indemnification powers to all persons against all damages incurred in connection with our business to the fullest extent provided or allowed by law. These indemnification provisions may require us to use our limited assets to defend our directors and officers against claims, and may have the effect of preventing stockholders from recovering damages against our directors and officers caused by their negligence, poor judgment or other circumstances.

 

Several of our directors and officers are residents outside of the United States., and it may be difficult for stockholders to enforce within the United States any judgments obtained against such directors or officers.

 

Several of our directors and officers are nationals and/or residents of countries other than the United States, and all or a substantial portion of such persons’ assets are located outside of the United States. As a result, it may be difficult for investors to effect service of process on such directors and officers, or enforce within the United States any judgments obtained against such directors and officers, including judgments predicated upon the civil liability provisions of the securities laws of the United States or any state thereof. Consequently, stockholders may be effectively prevented from pursuing remedies against such directors and officers under United States federal securities laws. In addition, stockholders may not be able to commence an action in a Canadian court predicated upon the civil liability provisions under United States federal securities laws. The foregoing risks also apply to those experts identified in this document that are not residents of the United States.

 

Disclosure controls and procedures and internal control over financial reporting, no matter how well designed and operated, are designed to obtain reasonable, and not absolute, assurance as to its reliability and effectiveness.

 

Management’s evaluation on the effectiveness of disclosure controls and procedures is designed to ensure that information required for disclosure in our public filings is recorded, processed, summarized and reported on a timely basis to our senior management, as appropriate, to allow timely decisions regarding required disclosure. Management’s report on internal control over financial reporting is designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use and transactions are properly recorded and reported. However, any system of controls, no matter how well designed and operated, is based in part upon certain assumptions designed to obtain reasonable, and not absolute, assurance as to its reliability and effectiveness. Any failure to maintain effective disclosure controls and procedures in the future may result in our inability to continue meeting our reporting obligations in a timely manner, qualified audit opinions or restatements of our financial reports, any one of which may affect the market price for our common stock and our ability to access the capital markets.

 

Risks Related to Our Common Stock

 

Historically, the market price of our common stock has been and may continue to fluctuate significantly.

 

On September 28, 2007, our common stock commenced trading on the NYSE MKT (formerly known as the American Stock Exchange and the NYSE Amex Equities Exchange) and prior to that, traded on the OTC Bulletin Board.

 

The global markets have experienced significant and increased volatility in the past, and have been impacted by the effects of mass sub-prime mortgage defaults and liquidity problems of the asset-backed commercial paper market, resulting in a number of large financial institutions requiring government bailouts or filing for bankruptcy. The effects of these past events and any similar events in the future may continue to or further affect the global markets, which may directly affect the market price of our common stock and our accessibility for additional financing. Although this volatility may be unrelated to specific company performance, it can have an adverse effect on the market price of our shares which, historically, has fluctuated significantly and may continue to do so in the future.

 

In addition to the volatility associated with general economic trends and market conditions, the market price of our common stock could decline significantly due to the impact of any one or more events, including, but not limited to, the following: (i) volatility in the uranium market; (ii) occurrence of a major nuclear incident such as the events in Fukushima in March 2011; (iii) changes in the outlook for the nuclear power and uranium industries; (iv) failure to meet market expectations on our exploration, pre-extraction or extraction activities, including abandonment of key uranium projects; (v) sales of a large number of our shares held by certain stockholders including institutions and insiders; (vi) downward revisions to previous estimates on us by analysts; (vii) removal from market indices; (viii) legal claims brought forth against us; and (ix) introduction of technological innovations by competitors or in competing technologies.

 

 46 

 

 

A prolonged decline in the market price of our common stock could affect our ability to obtain additional financing which would adversely affect our operations.

 

Historically, we have relied on equity financing and more recently, on debt financing, as primary sources of financing. A prolonged decline in the market price of our common stock or a reduction in our accessibility to the global markets may result in our inability to secure additional financing which would have an adverse effect on our operations.

 

Additional issuances of our common stock may result in significant dilution to our existing shareholders and reduce the market value of their investment.

 

We are authorized to issue 750,000,000 shares of common stock of which 116,092,655 shares were issued and outstanding as of April 30, 2016. Future issuances for financings, mergers and acquisitions, exercise of stock options and share purchase warrants and for other reasons may result in significant dilution to and be issued at prices substantially below the price paid for our shares held by our existing stockholders. Significant dilution would reduce the proportionate ownership and voting power held by our existing stockholders, and may result in a decrease in the market price of our shares.

 

We filed a 2014 Shelf, which was declared effective on January 10, 2014. This Registration Statement provides for the public offer and sale of certain securities of the Company from time to time, at our discretion, up to an aggregate offering amount of $100 million, of which a total of $35.1 million has been utilized through public offerings as of April 30, 2016.

 

We are subject to the Continued Listing Criteria of the NYSE MKT and our failure to satisfy these criteria may result in delisting of our common stock.

 

Our common stock is currently listed on the NYSE MKT.  In order to maintain this listing, we must maintain certain share prices, financial and share distribution targets, including maintaining a minimum amount of shareholders’ equity and a minimum number of public shareholders.  In addition to these objective standards, the NYSE MKT may delist the securities of any issuer (i) if, in its opinion, the issuer’s financial condition and/or operating results appear unsatisfactory; (ii) if it appears that the extent of public distribution or the aggregate market value of the security has become so reduced as to make continued listing on the NYSE MKT inadvisable; (iii) if the issuer sells or disposes of principal operating assets or ceases to be an operating company; (iv) if an issuer fails to comply with the NYSE MKT’s listing requirements; (v) if an issuer’s common stock sells at what the NYSE MKT considers a “low selling price” and the issuer fails to correct this via a reverse split of shares after notification by the NYSE MKT; or (vi) if any other event occurs or any condition exists which makes continued listing on the NYSE MKT, in its opinion, inadvisable.

 

If the NYSE MKT delists our common stock, investors may face material adverse consequences, including, but not limited to, a lack of trading market for our securities, reduced liquidity, decreased analyst coverage of our securities, and an inability for us to obtain additional financing to fund our operations.

 

 47 

 

 

Item 2.    Unregistered Sales of Equity Securities and Use of Proceeds

 

During our fiscal quarter ended April 30, 2016, we issued the following securities that were not registered under the Securities Act of 1933, as amended (the “Securities Act”):

 

·On February 3, 2016, we issued an aggregate of 116,364 shares of restricted common stock to three consultants in consideration for services under consulting agreements, as follows: (i) we issued 13,637 and 22,727 shares of restricted common stock to two consultants at a deemed issuance price of $1.10 per share; and (ii) we issued 80,000 shares of restricted common stock to a consultant at a deemed issuance price of $0.91 per share. We relied on exemptions from registration under the Securities Act provided by Rule 506 of Regulation D and/or Section 4(a)(2) with respect to the issuance of these shares to one consultant and on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares to the other two consultants.

 

·On February 17, 2016, we issued 487,574 shares of restricted common stock to two consultants pursuant to shares for debt subscription agreements at a deemed issuance price of $0.83367 per share. We relied on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares.

 

·On February 17, 2016, we issued 20,833 shares of restricted common stock to a consultant in consideration for services under a consulting agreement at a deemed issuance price of $1.20 per share. We relied on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares.

 

·On March 3, 2016, we issued an aggregate of 36,363 shares of restricted common stock to two consultants in consideration for services under consulting agreements at a deemed issuance price of $1.10 per share. We relied on exemptions from registration under the Securities Act provided by Rule 506 of Regulation D and/or Section 4(a)(2) with respect to the issuance of these shares to one consultant and on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares to the other consultant.

 

·On March 4, 2016, we issued 1,333,560 shares of restricted common stock to CIC Resources Inc. pursuant to the SPOA at a deemed issuance price of $0.8985 per share. We relied on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares.

 

·On March 8, 2016, we issued an aggregate of 123,000 shares of restricted common stock to two consultants in consideration for services under consulting agreements at a deemed issuance price of $0.86 per share. We relied on exemptions from registration under the Securities Act provided by Rule 506 of Regulation D and/or Section 4(a)(2) with respect to the issuance of these shares to one consultant and on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares to the other consultant.

 

·On March 29, 2016, we issued an aggregate of 138,000 shares of restricted common stock to two consultants in consideration for services under consulting agreements at a deemed issuance price of $0.74 per share. We relied on exemptions from registration under the Securities Act provided by Rule 506 of Regulation D and/or Section 4(a)(2) with respect to the issuance of these shares to one consultant and on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares to the other consultant.

 

·On April 1, 2016, we issued an aggregate of 36,363 shares of restricted common stock to two consultants in consideration for services under consulting agreements at a deemed issuance price of $1.10 per share. We relied on exemptions from registration under the Securities Act provided by Rule 506 of Regulation D and/or Section 4(a)(2) with respect to the issuance of these shares to one consultant and on exemptions from registration under the Securities Act provided by Regulation S and/or Section 4(a)(2) with respect to the issuance of these shares to the other consultant.

 

 48 

 

 

Item 3.    Defaults Upon Senior Securities

 

None.

 

Item 4.    Mine Safety Disclosures

 

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the “Dodd-Frank Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States, and that is subject to regulation by the Federal Mine Safety and Health Administration under the Mine Safety and Health Act of 1977 (“Mine Safety Act”), are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During the quarter ended April 30, 2016, the Company’s Palangana Mine was not subject to regulation by the Federal Mine Safety and Health Administration under the Mine Safety Act.

 

Item 5.    Other Information

 

None.

 

Item 6.    Exhibits

 

The following exhibits are included with this Quarterly Report on Form 10-Q:

 

Exhibit   Description of Exhibit
     
31.1  

Certification of Chief Executive Officer pursuant to the Securities Exchange Act of 1934 Rule 13a-14(a) or 15d-14(a).

     
31.2  

Certification of Chief Financial Officer pursuant to the Securities Exchange Act of 1934 Rule 13a-14(a) or 15d-14(a).

     
32.1   Certifications pursuant to the Securities Exchange Act of 1934 Rule 13a-14(b) or 15d-14(b) and 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
     
101.1NS   XBRL Instance Document
     
101.SCH   XBRL Taxonomy Extension Schema Document
     
101.CAL   XBRL Taxonomy Extension Calculation Linkbase Document
     
101.DEF   XBRL Taxonomy Extension Definitions Linkbase Document
     
101.LAB   XBRL Taxonomy Extension Label Linkbase Document
     
101.PRE   XBRL Taxonomy Extension Presentation Linkbase Document

 

 49 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 

  URANIUM ENERGY CORP.
     
  By: /s/ Amir Adnani
    Amir Adnani
    President, Chief Executive Officer (Principal Executive Officer) and Director
    Date: June 8, 2016
     
  By: /s/ Pat Obara
    Pat Obara
    Chief Financial Officer (Principal Financial Officer)
    Date: June 8, 2016

 

 50